Installation
24
STARTING HYDRAULIC CIRCUIT
1 Generator
2 Pressure transducer
3 Thermometer
4 Pressure gauge
5 Thermostat
6 Safety valves
7 Burner
8 Fuel shut-off solenoid valve
9 Boiler drain
10 Delivery
11 Return
12 System pumps
13 Flow switch
14 Water mains
15 Water softener
16 Water load solenoid valve
17 Water supply tank
18 Water tank level regulator
19 System refilling pump
20 Closed expansion vessel
21 Level indicator
22 Pressure gauge
23 Air supply pressure switch
24 Pressure transducer
25 Level regulation probes
26 Expansion vessel safety valve
27 Expansion vessel drain
28 Air supply
29 Air supply solenoid valve
30 Use
31 Recirculation pump
FLUE EXHAUST
The main chimney features, such as height, section, type of outlet in the atmosphere, control points, smoke mass, must be
established by a company specialised in the sector that will operate according to the applicable Standards and Legislation. The
connection between chimney and generator (smoke duct) must be made according to the specific plant requirements.
m
IMPORTANT
The diameter of the connection between chimney and generator (smoke duct) must not be less than that shown in
the "DIMENSIONS AND CONNECTIONS" table (ØC value).
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz