
10
ISI-300T W
Water
connection
Drain
connection
A
●
Check the followings after connecting the feed and discharge water lines:
1. Feed water pressure should be between 1~3kgf/
㎠ .
▶
If the water pressure is too high, water may leak at connections.
2. If the temperature can go down below 10℃, provide a means to prevent freezing.
▶
Freezing can cause water leakage or failure of the system.
3. There should be a tap water valve when you connect the system to tap water.
Close the tap water valve if there is water leak due to a defect of the tap on top of the product.
1. Coil teflon tape 5~10 times around the thread of
water supply connector.
2. Fir rubber packing in the corrugated tube nut
of the feed water line and join it to the water
inlet of the product.
Tighten the nut firmly with a tool.
3. Pay special attention to protecting Section “A”
from damage when assembling the tools.
●
Water Supply Connection
The raw water supply valve may vary depending on the installation environment of the system.
Measurement must be taken by a qualified electrician and adjust voltage to values displayed in '1-3'.
Otherwise, icecream will be too waterly or too thick.
For your
infromatoon
Summary of Contents for ISI-300TW
Page 41: ...41 Circuit diagram...
Page 42: ...42 Circuit diagram...
Page 44: ...44 Part list OUT SIDE SSI 151...
Page 45: ...45 Part list MOVE PART SSI 151...
Page 46: ...46 Part list SSI 151...
Page 47: ...47 Part list SSI 300...
Page 48: ...48 Part list SSI 300...
Page 49: ...49 Part list SSI 300...
Page 50: ...50 Part list SSI 300 DASHER ASSY...
Page 51: ...51 Part list SSI 300 REFRIGERANT...
Page 52: ...52 Part list SSI 300 ASSY CONTROL BOX...
Page 53: ...MEMO 53...
Page 54: ...MEMO 54...
Page 55: ...MEMO 55...
Page 56: ...3240216 03 Online Internet Service http www icetro com...