5.  OPERATION 

 

5.1.  Preliminary checks 

 

a) Is the machine levelled? 

b) Are voltage and frequency of mains supply the same as indicated on rating plate?

c) Is drainage system working properly?

d) Is air circulation and room temperature adequate? (Air

 

AMBIENT TEMPERATURE 

 

 

  MAXIMUM  

43° C   

 

MINIMUM 

  5° C   

 

   e) Is water pressure adequate?

 

 

  MAXIMUM  

 

0.7 Kg/cm2

 

MINIMUM 

 

6 Kg/cm2

 

ATENTION: Check that voltage and mains frequency is the same as in the rating plate.

 

5.2.  Starting up 

Once  preliminary  check  has  been 

proceed as follows: 

1. Open water faucet. Check for leaks.

2. Plug machine into electricity mains supply.

3. Ensure that there are no strange vibrations or scraping sounds

4. Check that the water curtain moves freely

5. At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the 
last 50 mm.

 

 

ICE TECH PS                                                                                                                                  Technical Service Manual

                                                                                                                                                                                                             

voltage and frequency of mains supply the same as indicated on rating plate?

c) Is drainage system working properly? 

d) Is air circulation and room temperature adequate? (Air-cooled models) 

 

WATER TEMPERATURE 

 

         35° C 

               

5° C 

e) Is water pressure adequate? 

0.7 Kg/cm2 

6 Kg/cm2 

Check that voltage and mains frequency is the same as in the rating plate.

Once  preliminary  check  has  been  completed  (ventilation,  connections,  temperature,  etc.), 

Open water faucet. Check for leaks. 

Plug machine into electricity mains supply. 

Ensure that there are no strange vibrations or scraping sounds 

curtain moves freely. 

At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the 

Technical Service Manual

 

 

                                                                                 

voltage and frequency of mains supply the same as indicated on rating plate? 

cooled models)  

Check that voltage and mains frequency is the same as in the rating plate. 

completed  (ventilation,  connections,  temperature,  etc.), 

At the cycle’s end, there should be frost forme don the compressor inlet tuve except for the 

Summary of Contents for PS 22

Page 1: ...PROVIDE IMPORTANT INFORMATION RELATIVE TO SAFETY DURING INSTALLATION USE ICE TECH PS Technical Service Manual TECHNICAL SERVICE MANUAL 122 CAREFULLY READ THE INSTRUCTIONS CONTAINED IN THIS MANUAL SIN...

Page 2: ...e pressostat 6 2 Fan pressostat air cooled models 6 3 Safety pressostat 7 MAINTENANCE AND CLEANING INSTRUCTIONS 8 MAINTENANCE AND CLEANING PROCEDURES 8 1 Special advise concerning R 9 TROUBLESHOOTING...

Page 3: ...uld be accessible at all times To reduce the risk of electrical shock ALWAYS disconnect the machine BEFORE cleaning or the equipment Do not attempt to install service or modify this machine Improper u...

Page 4: ...or motor for continuous service Tough cam motor 50 Kg cm Safety device and clutch for the water pan preventing its breakage during the upward cycle Machine stoppage and water pan protection during the...

Page 5: ...ops and the agitator motor is connected The cam motor starts to move downwards making part of the surplus flow to the drain and dropping the ice cubes pushed by the eject plate into the storage bin Th...

Page 6: ...as it touches the cubes so switch and switching off the machine Production will start again as soon as the cubes which detained it move or are removed Diagrams of connections and dimensions undercoun...

Page 7: ...0 4 19 39 490x595x830 5 5 42 490x595x960 5 30 42 490x595x960 7 7 48 610x640x960 7 40 48 610x640x960 6 6 55 690x640x1080 6 41 55 690x640x1080 11 11 60 770x640x1080 11 68 60 770x640x1080 11 11 80 940x64...

Page 8: ...9 5 19 18 27 28 29 30 22 20 19 5 19 25 27 28 29 24 22 20 19 5 24 25 27 28 25 24 22 20 22 23 25 27 26 25 24 22 20 22 23 25 28 26 25 24 19 20 22 23 30 28 26 25 18 19 20 22 31 30 28 26 15 20 25 ICE TECH...

Page 9: ...5 26 28 29 37 35 33 32 24 25 26 28 38 37 35 33 22 24 25 26 40 38 37 35 21 22 24 25 42 40 38 37 20 21 22 24 44 42 40 38 19 20 21 22 45 44 42 40 15 20 25 ICE TECH PS 62 27 28 29 30 39 38 36 35 26 27 28...

Page 10: ...9 30 31 32 49 47 45 44 28 29 30 31 52 49 47 45 26 28 29 30 59 52 49 47 24 26 28 29 62 59 52 49 22 24 26 28 65 62 59 52 21 22 24 26 68 65 62 59 15 20 25 ICE TECH PS 82 28 29 30 31 66 61 59 57 26 28 29...

Page 11: ...PS Technical Service Manual ICE TECH PS 122 28 29 30 31 92 85 81 79 26 28 29 30 99 92 85 81 24 26 28 29 103 99 92 85 23 24 26 28 108 103 99 92 22 23 24 26 114 108 103 99 21 22 23 24 119 114 108 103 20...

Page 12: ...presence of delivery personnel noting any damage on the waybill ICE TECH packing bears the Green Point on all models according to the European Directives Packaging and Waste Disposal Be sure to inclu...

Page 13: ...has to be performed with the wooden base structure firmly placed on the ground All packaging elements plastic bags cartons etc must not be left at childr ial source of danger Place the machine where i...

Page 14: ...a carbon filter Code NOTE You may encounter water with ALL aforementioned properties A 10 reduction in overall production may occur Connecting unit to water source water cooler units Use 1 3 m flexibl...

Page 15: ...ve been There should be a 150 mm gap on sides and top of the machine so as to allow air to circulate This valve is factory set but may need to be adjusted if mains water pressure is very high or very...

Page 16: ...hnical Service Manual voltage and frequency of mains supply the same as indicated on rating plate c Is drainage system working properly d Is air circulation and room temperature adequate Air cooled mo...

Page 17: ...d closing the condenser water valve Differential is a fixed 1 kg cm2 14 Psi The valve closes at 16 Kg cm2 228 Psi which is equivalent to a water exit temperature of 38 C below this pressure it will be...

Page 18: ...rvice Manual cooled models Pressure control operates on high pressure by starting and stopping fan Differential is fixed off pressure must be 16 kg cm2 228 Psi Low pressure values may cause gearbox ma...

Page 19: ...iling to carry them out are not covered by the warranty Proper maintenance is essential to obtain favourable ice quality and optimum functioning of unit Frequency depends on water quality and characte...

Page 20: ...screwdriver ICE TECH PS Technical Service Manual MAINTENANCE AND CLEANING PROCEDURES WARNING Unit should always be disconnected during maintenance cleaning water entry exit from condenser 4 Prepare a...

Page 21: ...Once the water pan returns to its horizontal position again switch off the machine Pour 3 litres of water and one half of di caloid ICE TECH cleaner into water pan work for 20 or 30 minutes occasiona...

Page 22: ...nd Check that the valve closes tightly on models with an automatic cleaning system Special advise concerning R 404 Refrigerant Refills and drains should be carried out at the liquid parts end of conde...

Page 23: ...ater condenser pressostat wrongly adjusted or faulty I Adjust or replace J Faulty water inlet valve J Replace K No condensable gases in the system K Purge system and charge refrigerant A Inefficient c...

Page 24: ...ng intermittently the capillar B Remove the dehydrator unblock capillary and replace with new dehydrator Proceed again with purge and refill 10 The tray remains in stop position A faulty connecting ro...

Reviews: