Preservation Instructions 

 
Unpacking Inspection 

Caution: It is recommended using gloves and protective eyewear when unpacking 

 
Verify product is as identified on the packing list. Air conditioner should arrive banded to pallet and 
wrapped with an outer protective clear plastic membrane material in the proper upright position. See arrows 
on packaging for verification. Any evidence of damage should be noted on the freight bill. The freight 
carriers claim procedure should be followed. 

Ice Qube cannot accept responsibility for damages that 

occur during shipping. 

If the shipping container was damaged or marred in any way, check for scratches, 

dents, loose hardware, presence of oil or any other irregularities with the Ice Qube TMS.

 

 

Package Contents 
Included in the shipment with the air conditioner will be: 

1.

 

Operation manual 

2.

 

Mounting hardware 

3.

 

(2) Bolts w/ washer for replacing lifting lugs after final installation 

 

Handling 
Ice Qube recommends that the unit remains in the proper upright position, as indicated on the shipping 
container.  The unit must remain upright for a minimum of 24 hours before initial operation to ensure oil 
has returned to the compressor. Operation before the 24-hour time may cause compressor damage and 
shorten the life of the system. 

Operation before this 24-hour period will void all warranties. 

 

Storage

 

It is recommended the air conditioner be stored in the original packaging in a secure area where it will not 
be damaged. If the packaging is to be removed, use lifting lugs to move the air conditioner. Before use, 
check that the lifting lugs on top of the air conditioner are secure and have not loosened during shipment. 
The storage space temperature should be in the range of -40 to 60°C (-40 to 140°F) in a non-condensing 
environment with a relative humidity of 0 to 95%. 

 

CONDITIONS OF ACCEPTABILITY:

 When installed in the end use equipment, the following 

considerations are to be examined:

 

 

1.

 

Please contact Ice Qube with any questions regarding services before opening or altering the 
system from its original factory configuration. 

 

2.

 

Surfaces are to be cleaned only with a damp cloth to avoid build-up of electrostatic charge. 

 

3.

 

Cable type should be a flexible conduit that is effectively clamped to prevent twisting and pulling. 

 

 

Summary of Contents for EX series

Page 1: ...TION MANUAL IMPORTANT PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system Keep this manual for future reference Some information may...

Page 2: ...on 7 Electrical Installation Instruction 8 Operating Your System 10 Thermostat Operation 10 Service and Maintenance Instruction 11 Trouble Shooting 12 Schematic Wiring Diagrams 14 Specification Drawin...

Page 3: ...within the enclosure The three main thermal related systems that we employ are the closed loop cold air supply stream the heat rejection air stream and the vapor compression refrigeration system The...

Page 4: ...ng container The unit must remain upright for a minimum of 24 hours before initial operation to ensure oil has returned to the compressor Operation before the 24 hour time may cause compressor damage...

Page 5: ...struction for wiring details Page 8 Note If any unusual noise or vibration is present during the testing procedure immediately disconnect the power and inspect the exterior of the unit for the cause o...

Page 6: ...e TMS Refer to individual specification drawings for model weights 2 Using the specification drawing determine the ideal location to install the Ice Qube TMS on your enclosure 3 Upon deciding the inst...

Page 7: ...y seal the Ice Qube TMS to your enclosure 4 Using a wrench tighten the nuts and bolts until the gasket between the air conditioner and the enclosure is compressed to a maximum thickness of 1 8 3 175mm...

Page 8: ...Locate customer interface electrical junction box on enclosure side of air conditioner See Figure 3 Customer Interface pg 9 3 Remove the 4 terminal box cover screws and remove the cover See Figure 2 C...

Page 9: ...9 Rev 1 Figure 2 Customer Wiring Figure 3 Customer Interface...

Page 10: ...se of the thermostat T675A is to cycle on and off the cooling system as required from the heat produced by the equipment within the enclosure to prevent heat fatigue thus extending the life of the ele...

Page 11: ...trapped by the filter Dry type of debris may typically be removed with the use of compressed air blowing in the opposite direction of the air movement through the filter as when the filter is install...

Page 12: ...DO NOT remove the cover without first notifying customer service Removal of the cover will immediately void the warranty If an operating problem should occur please review the items outlined on the fo...

Page 13: ...he compressor and condenser warm air stream blower operating Yes No Is the enclosure door closed tightly Yes No Are all of the gaskets in place Yes No Has the condenser warm air stream filter been cle...

Page 14: ...14 Rev 1 Schematic Wiring Diagrams Figure 4...

Page 15: ...15 Specification Drawing IQ4000EX Figure 5...

Page 16: ...16 Rev 1 IQ5000EX Figure 6...

Page 17: ...17 Rev 1 IQ6000EX Figure 7...

Page 18: ...18 Rev 1 IQ8000EX Figure 8...

Page 19: ...19 Rev 1 IQ10000EX Figure 9...

Page 20: ...20 Rev 1 IQ12000EX Figure 10...

Page 21: ...21 Rev 1 IQ4 5 6000EX Gasket and Cutout Same Gasket and Cutout for IQ4000EX IQ5000EX and IQ6000EX Figure 11...

Page 22: ...22 Rev 1 IQ8 10 12000EX Gasket and Cutout Same Gasket and Cutout for IQ8000EX IQ10000EX and IQ12000EX Figure 12...

Page 23: ...ility or any other theory of liability will be limited to the lesser of customer s actual damages or the price paid by customer to Ice Qube for the Products not including applicable taxes duties and f...

Page 24: ...be deemed to be non binding Such advice does not relieve customer from the obligation and customer accepts full responsibility to confirm for itself the suitability of the Products for their intended...

Page 25: ...25 Rev 1 Notes...

Reviews: