Seite 70 PANDA 06 - 75 Fahrzeug 230V/50Hz 120V/60Hz Betriebsanleitung/Operation manual
...\Handbuch\Fahrzeug\2-spaltig\Panda16\MPL\P15v2v04.p65
02´02
Made by ICEMASTER GmbH - Germany
4.5.1 AC-Main Supply Installation (AC-Control Box)
ATTENTION! Before working on the System read the sec-
tion "Safety Instructions" in this manual.
The AC connections for the generator are installed at the manufacturer.
The installation of the 400/230/120V power system starts at the AC-
Control box and all the required terminals mounted in the box.
Ensure that the power supply system installation conforms to
all of the required electrical system safety regulations of your
local authorities. Only a qualified electrician should install the
electrical system. Especially adherance to the regulations
regarding conducters, safety switches etc.
4.5.1 Anschluß an das AC-Netz (AC-Kontrollbox)
ACHTUNG! Vor Bearbeitung unbedingt das Kapitel "Sicher-
heitshinweise" in diesem Handbuch lesen.
Die Wechselstromanschlüsse sind, soweit für den Betrieb des Generators
erforderlich, schon vorinstalliert.
Von der AC-Kontrollbox aus wird der Netzanschluß für 400/230/120V
verlegt. Die entsprechenden Anschlußklemmen sind hierfür vorbereitet.
Bei der Installation des elektrischen Systems muß unbedingt
darauf geachtet werden, daß die örtlichen Vorschriften der
jeweiligen Elektroversorgungsunternehmen eingehalten wer-
den. Hierzu gehört insbesondere die Einhaltung der Vorschrif-
ten für Schutzleiter, Personenschutzschalter etc.
Anschlußplan
Connection diagram
01. Generator
02. Batterie
03. AC-Kontrollbox
04. Verteiler
05. Fernbedienpanel
06. Kraftstoffpumpe
01. Generator
02. Battery
03. AC-Control box
04. Distribution panel
05. Remote control panel
06. Fuel pump
K09PMPNB940
DC Installation
DC Installation
01
02
03
06
05
04