background image

11

Summary of Contents for B1000-48

Page 1: ...essary Heat conduction through metal may melt threads in plastic drain fitting When leveling do not extend any leg more than 1 in 26mm for total leg height no greater than 2 125 in 54mm Installation 1 Remove all packing material from bin 2 Remove all tape and temporary fastenings from door assemblies and outside of bin 3 Remove set of four legs and any other accessories packed inside bin 4 Lay bin...

Page 2: ...de room for door stud to clear bracket 6 Reinstall washer and screw in lift door and tighten 7 Check door to ensure proper operation Operation Ice Shield Operation Ice O Matic s unique Ice Shield positively controls the flow of ice into lower door assembly area for removal with either a scoop or shovel Ice Shield can also be adjusted and locked at one of several levels to accommodate flow characte...

Page 3: ...ion or maintenance of Ice O Matic ice storage bins please call our technical service department at 800 423 3367 US Canada between 7 30 a m and 4 00 p m Mountain time Cleaning Interior of bin must be cleaned and sanitized prior to use and should be cleaned on routine basis during use Interior Bin Care Ice O Matic single door upright ice storage bins are equipped with polyethylene liner walls and st...

Page 4: ...A 10 1011517 18 Hinge Bracket Bin Mount Includes Hardware X X X X X 11 1011517 19 Drain Assembly Plastic X X X X X 12 1011517 20 Legs 6 inch Stainless Steel Set of 4 X X X X X 12 1011517 21 Legs 6 inch Stainless Steel Flanged Foot Set of 4 X X X X X NS 1011517 22 Shovel Ice Plastic X X X X X NS 1011517 23 Bracket Ice Shovel X X X X X NS 1011517 24 Paddle Ice 46 5 Inch Total Length X X X X X NS 101...

Page 5: ...GE WITH SEALANT front GASKET 22 5 16 5 8 24 7 8 ICE 1006 ICE 1506 SEAL INSIDE EDGE WITH SEALANT front GASKET SEAL INSIDE EDGE WITH SEALANT front GASKET NO FILLER PANEL REQ D NO FILLER PANEL REQ D FILLER S 30 WIDE BIN GASKET PATTERN FOR ICE O MATIC FLEXITOP 1 8 7 16 23 11 16 25 5 8 FILLER S SEAL FILLER S FILLER S ...

Page 6: ...L INSIDE EDGE OF GASKET AROUND ICE DROP OPENING WITH SEALANT SUPPLIED APPLY 3 8 GASKET TO BIN TOP PER DIMENSIONS SHOWN AND AROUND ICE DROP OPENING USING THE ILLUSTRATION FOR THE SPECIFIC ICEMAKER YOU ARE INSTALLING POSITION ICEMAKER ONTO BIN BY PEELING PAPER BACKING AND ADHERING TO TOP PER DIMENSION SHOWN FILLER L FILLER L FILLER L FILLER L w 2nd flange front INSIDE EDGE WITH SEALANT GASKET SEAL f...

Page 7: ...4 7 8 14 3 8 13 1 2 5 8 GASKET INSIDE EDGE SEAL WITH SEALANT INSIDE EDGE SEAL WITH SEALANT 12 19 9 16 OPENING OPENING 24 7 8 5 8 22 5 16 5 8 23 GASKET 27 1 8 9 7 8 9 3 4 13 3 8 13 1 2 FILLER S FILLER S FILLER L FILLER L w 2nd flange 17 FILLER L w 2nd flange 7 1 8 8 OPENING OPENING FILLER L w 2nd flange 1 ICE 0926 2 ICE 0926 FILLER L FILLER S FILLER S FILLER L FILLER L FILLER L FILLER L FILLER L ...

Page 8: ...CE DROP OPENING WITH SEALANT SUPPLIED APPLY 3 8 GASKET TO BIN TOP PER DIMENSIONS SHOWN AND AROUND ICE DROP OPENING USING THE ILLUSTRATION FOR THE SPECIFIC ICEMAKER YOU ARE INSTALLING POSITION ICEMAKER ONTO BIN BY PEELING PAPER BACKING AND ADHERING TO TOP PER DIMENSION SHOWN FILLER L FILLER L FILLER L FILLER L w 2nd flange front INSIDE EDGE WITH SEALANT GASKET SEAL FILLER L FILLER L w 2nd flange fr...

Page 9: ...ILLER L 16 1 16 16 1 16 front GASKET SEAL INSIDE EDGE WITH SEALANT FILLER L FILLER L 15 1 16 15 1 16 23 11 16 7 16 FILLER L FILLER L FILLER L FILLER L w 2nd flange FILLER L w 2nd flange FILLER L front front 18 7 8 18 7 8 24 7 8 19 7 8 19 7 8 5 8 GASKET INSIDE EDGE SEAL WITH SEALANT INSIDE EDGE SEAL WITH SEALANT 16 3 16 15 1 16 OPENING OPENING 1 2 24 7 8 5 8 22 13 16 7 5 8 29 15 16 GASKET 38 5 16 ...

Page 10: ...10 ...

Page 11: ...11 ...

Page 12: ...12 9081461 01 01078856R00 12 14 ...

Reviews: