Page 2
Verification of Checks and repairs
NIKITA 5
Serial number: ………………………….……………
ICARO incoming test/ date: ……….……..…………
………………………….
Name/ Stamp
Check (C)
Repair (R)
Which repair/ Check?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Check (C)
Repair (R)
Which repair/ Check?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Check (C)
Repair (R)
Which repair/ Check?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Summary of Contents for Nikita 5
Page 1: ...Version 2 2016...
Page 14: ...Page 14...