52
Chapter 8
– Operational
breaks
Chapter 8
– Operational breaks
Information contained in this chapter:
How long you have to wait before starting the next program
What you need to be aware of if the unit has not been used for a long time
How to take the unit out of operation, transport it, and then put it
back into operation
No breaks required
Breaks
Breaks between individual programs are not required. After a program
has completed or been canceled, the instruments can be replaced. A
program can be started only after the unit has cooled to below 45 °C.
Taking the unit out of operation
If you would like to take the HD 450/HD 450
Injection
out of operation for a longer
period of time, e.g.
due to a vacation, proceed as follows:
The interior of the washing chamber should be dry.
Turn off the HD 450/HD 450
Injection
at the power switch.
Unplug the power plug from the socket.
Turn off the water supply.