Related
topics:
v
v
Verifying
the
SAN
Volume
Controller
installation
After
you
have
installed
the
SAN
Volume
Controller
into
the
rack
and
connected
it
to
both
the
uninterruptible
power
supply
and
the
SAN,
this
task
provides
the
steps
you
complete
to
verify
the
installation.
Prerequisites:
Check
the
configuration
data
table
provided
by
the
customer
the
speed
at
which
the
SAN
Volume
Controller
nodes
are
to
be
operated
(usually
2
Gbps).
Steps:
Perform
the
following
steps
to
verify
the
installation
of
the
SAN
Volume
Controller.
1.
Press
the
SAN
Volume
Controller
power
switch.
Verify
that
the
green
power
light
is
on.
If
the
light
is
not
on
go
to
MAP
5000:
Start
to
repair
the
problem.
Note:
You
do
not
need
to
install
any
software.
The
node
boots
automatically.
Verify
that
the
node
is
booting
without
error:
v
If
it
boots
without
error,
the
Charging
message
is
displayed
in
line
1
of
the
front
panel
display.
A
progress
bar
is
displayed
in
line
2
of
the
front
panel
display.
Battery
charging
can
take
up
to
3
hours
until
the
battery
is
fully
charged.
When
the
battery
is
charged
enough,
Cluster:
is
displayed
in
line
1
of
the
front
panel
display;
line
2
is
blank.
2.
Press
and
hold
the
select
button
for
five
seconds.
The
check
light
comes
on
and
a
display
test
is
performed.
When
the
display
test
is
complete
the
check
light
goes
off
and
a
button
test
is
started.
3.
Press
the
up,
down,
left,
and
right
buttons
to
verify
that
they
are
working.
See
which
shows
four
examples
of
what
the
front
panel
should
display
when
you
press
the
buttons.
When
you
have
finished
testing
the
buttons,
press
and
hold
the
select
button
for
five
seconds
to
exit
the
test.
4.
If
the
Charging
message
is
displayed
on
the
front
panel
display,
press
the
select
button
to
switch
to
the
menu.
The
menu
continues
to
be
displayed
while
you
press
the
buttons
on
the
front
panel.
If
you
do
not
press
any
No button pressed (border only)
Up button pressed
Left and Right button pressed
Select button pressed
Figure
35.
Front
panel
display
when
push
buttons
pressed
Chapter
4.
Installing
the
uninterruptible
power
supply,
the
master
console,
and
the
SAN
Volume
Controller
33
|
|
|
|
|
Summary of Contents for TotalStorage
Page 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 2: ......
Page 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Page 22: ...xx Installation Guide...
Page 36: ...14 Installation Guide...
Page 58: ...36 Installation Guide...
Page 74: ...52 Installation Guide...
Page 80: ...58 Installation Guide...
Page 84: ...62 Installation Guide...
Page 89: ......
Page 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Page 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...