
installp
version,
the
ODM
entries
might
not
exist
and
this
command
fails.
In
that
case,
run
java
-version
to
determine
if
it
exists
on
the
system.
Ensure
that
the
PATH
statement
for
root
allows
for
proper
access
to
the
level
of
Java
that
you
want
to
use.
Try
the
which
java
command
.
7.
If
an
existing
Internet
connection
is
to
be
used
and
no
modem
connection
is
needed,
continue
with
step
12
on
page
204.
Complete
the
intervening
steps
only
if
you
are
using
a
modem
connection
for
primary
or
secondary
access
to
IBM.
Modem
communication
steps
8.
Since
your
NAS
Gateway
500
is
your
Electronic
Service
Agent
gateway
server,
your
modem
must
be
attached
to
serial
port
2
and
a
console
to
serial
port
1.
Make
a
record
of
which
TTY
device
(for
example,
tty1
)
is
mapped
to
serial
port
2
(location:
01–S2–00).
The
lsdev
-Cc
tty
command
lists
all
TTY
devices
and
their
locations.
Verify
the
serial
port
TTY
characteristics
(such
as
tty1):
v
tty
interface
is
RS232
v
baud
rate
is
9600
or
higher
v
login
enable
is
disabled
v
flow
control
is
RTS
Use
SMIT
TTY
to
verify
or
change
these
settings.
Note:
Do
not
change
serial
port
1
to
login
disabled
.
The
service
console
access
requires
login
enable
be
set
to
enabled.
9.
The
modem
is
used
to
register
your
NAS
Gateway
500
and
to
call
the
IBM
SDR.
For
security,
only
outbound
calls
are
required
by
the
Electronic
Service
Agent,
so
the
auto-answer
capability
of
the
modem
should
be
disabled.
An
asynchronous
modem
with
a
minimum
communications
speed
of
9600
baud
and
error
correction
(in
the
United
States)
is
required.
Set
the
highest
possible
baud
rate
for
your
modem.
Refer
to
local
procedures
in
your
country
to
see
what
the
modem
requirements
are
for
the
Electronic
Service
Agent.
Complete
the
setup
instructions
from
Appendix
A,
“Modem
configurations,”
on
page
255
before
using
the
Electronic
Service
Agent.
10.
On
your
Electronic
Service
Agent
gateway
server,
ensure
that
Point-to-Point
Protocol
(PPP)
is
installed
and
configured.
PPP
is
only
required
if
a
modem
is
going
to
be
used
for
error
reporting
to
IBM.
Following
are
the
PPP
Link
configuration
parameters
with
general
minimum
values.
These
values
represent
the
minimum
configuration
required
by
the
Electronic
Service
Agent.
If
you
plan
to
use
PPP
for
anything
else,
these
settings
can
be
adjusted
as
needed.
There
should
be
an
available
0.0.0.0
interface
if
properly
configured.
To
prevent
the
setup
server
command
from
posting
an
error
message,
the
0.0.0.0
IP
should
be
defined
in
/etc/hosts
or
DNS.
Tip:
Enter
the
command
ps
-ef
|
grep
ppp
.
Look
for
pppcontrol.
If
you
find
this,
PPP
is
installed,
configured,
and
running.
Skip
to
the
next
step
and
check
diagnostics.
If
you
cannot
locate
pppcontrol,
enter
lslpp
-l
bos.net.ppp
.
This
command
indicates
whether
the
PPP
file
set
is
installed.
If
it
is
not
installed,
install
the
code
from
the
AIX
disk
using
SMIT.
Return
here
and
complete
the
following
steps
when
PPP
in
installed:
a.
Enter
smit
.
b.
Select
Communications
Applications
and
Services
.
c.
Select
PPP
.
Chapter
31.
Call
home
203
Summary of Contents for TotalStorage NAS Gateway 500
Page 12: ...xii NAS Gateway 500 Administrator s Guide ...
Page 16: ...xvi NAS Gateway 500 Administrator s Guide ...
Page 24: ...2 NAS Gateway 500 Administrator s Guide ...
Page 30: ...8 NAS Gateway 500 Administrator s Guide ...
Page 34: ...12 NAS Gateway 500 Administrator s Guide ...
Page 40: ...18 NAS Gateway 500 Administrator s Guide ...
Page 46: ...24 NAS Gateway 500 Administrator s Guide ...
Page 48: ...26 NAS Gateway 500 Administrator s Guide ...
Page 54: ...32 NAS Gateway 500 Administrator s Guide ...
Page 62: ...40 NAS Gateway 500 Administrator s Guide ...
Page 72: ...50 NAS Gateway 500 Administrator s Guide ...
Page 80: ...58 NAS Gateway 500 Administrator s Guide ...
Page 83: ...Figure 31 Volume selection panel Chapter 13 Using the Volume Wizard 61 ...
Page 92: ...Figure 39 Link aggregation complete 70 NAS Gateway 500 Administrator s Guide ...
Page 96: ...74 NAS Gateway 500 Administrator s Guide ...
Page 98: ...76 NAS Gateway 500 Administrator s Guide ...
Page 100: ...78 NAS Gateway 500 Administrator s Guide ...
Page 104: ...82 NAS Gateway 500 Administrator s Guide ...
Page 108: ...86 NAS Gateway 500 Administrator s Guide ...
Page 110: ...88 NAS Gateway 500 Administrator s Guide ...
Page 174: ...152 NAS Gateway 500 Administrator s Guide ...
Page 178: ...156 NAS Gateway 500 Administrator s Guide ...
Page 208: ...186 NAS Gateway 500 Administrator s Guide ...
Page 260: ...238 NAS Gateway 500 Administrator s Guide ...
Page 262: ...240 NAS Gateway 500 Administrator s Guide ...
Page 274: ...252 NAS Gateway 500 Administrator s Guide ...
Page 275: ...Part 6 Appendixes Copyright IBM Corp 2004 253 ...
Page 276: ...254 NAS Gateway 500 Administrator s Guide ...
Page 324: ...302 NAS Gateway 500 Administrator s Guide ...
Page 330: ...308 NAS Gateway 500 Administrator s Guide ...
Page 357: ......
Page 358: ... Part Number 24R1380 Printed in USA SC30 4072 01 1P P N 24R1380 ...