7.
Carefully
set
the
new
keyboard
into
the
tray;
then,
route
the
keyboard-and-mouse
cable
through
the
cord
clip
on
the
bottom,
up
through
the
opening
on
the
right
side
of
the
tray,
and
toward
the
cable-management
arm.
Pull
the
full
length
of
the
cable
through
the
opening.
Keyboard-and-mouse
cable routing
Fn
Ctr
l
Ctr
l
Alt
Alt
A
Z
S
X
D
C
F
V
G
B
H
N
J
M
K
<
,
L
>
.
:
;
?
/
“
‘
Enter
Shift
Shift
Caps Loc
k
Esc
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
Delete
Inser
t
Pr
tSc
End
ScrLk
Pause
1
Q
2
W
3
E
4
R
5
T
6
Y
7
U
8
I
9
O
0
P
{
[
}
]
|
\
Bac
kspa
Ta
b
~
`
_
-
+
=
8.
Secure
the
keyboard-and-mouse
cable
to
the
cable-management
arm
using
the
existing
cable
straps.
9.
Reconnect
the
keyboard-and-mouse
cable
to
the
server
or
console
switch.
Note:
When
the
monitor
and
keyboard
are
not
in
use,
if
the
rack
cabinet
is
in
a
vibration-prone
area,
or
during
cabinet
relocation,
tighten
the
two
thumbscrews
on
the
front
of
the
tray
to
secure
the
tray
inside
the
rack
cabinet.
Thumbscrew
26
IBM
17
″
1
U
Flat
Panel
Monitor
Console
Kit:
Installation
and
Maintenance
Guide
Summary of Contents for T-117
Page 1: ...IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 2: ......
Page 3: ...IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 6: ...iv IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 10: ...viii IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 14: ...4 IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 26: ...16 IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 56: ...46 IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 62: ...52 IBM 17 1 U Flat Panel Monitor Console Kit Installation and Maintenance Guide ...
Page 63: ......
Page 64: ... Part Number 02R2779 Printed in USA 1P P N 02R2779 ...