![IBM System Storage TS3500 Introduction And Planning Manual Download Page 154](http://html1.mh-extra.com/html/ibm/system-storage-ts3500/system-storage-ts3500_introduction-and-planning-manual_4089689154.webp)
Table 50. Specifications for power cords used with the IBM System Storage TS3500 Tape Library, Models L23, D23,
L53, and D53 (continued)
Length and Type of Power Cord
Part Number
and Feature
Code
1
Type of Service Receptacle
Dual 4.3 m (14 ft.) power cords, unterminated
(without a power plug), 200–240 V ac single
phase, 30 Amps maximum, with IRAM and
BSMI agency certifications. Wire size 4 mm
2
.
This is the recommended cord for Argentina,
Taiwan, Europe, the Middle East, and Africa if
an unterminated power cord is preferred.
23R7324 / 9959
(Used with FC
1950 only)
Not specified (no plug supplied)
Dual 4.3 m (14 ft.) power cords, unterminated
(without a power plug), 200–240 V ac single
phase, 30 Amps maximum, with CCC
certification. This is the recommended power
cord for China.
23R9543 / 9966
(Used with FC
1950 only)
Not specified (no plug supplied)
Note:
1.
Each feature code ships two power cords so that dual power is supported.
Note:
For more information about FC 9989, refer to the topic about powering
adjacent frames.
Powering adjacent frames
This topic describes how to power models L23, D23, L53 and D53 using power
distribution units (PDUs) and power cords to adjacent frame PDUs in order to
reduce the number of required facility outlets.
A library frame with PDUs (FC 1950) installed can power up to two adjacent
frames by specifying power cord FC 9989 on each of the adjacent frames and
a69i0339
1
5
2
3
4
7
6
8
9
10
11
12
A
N
13
Figure 31. Types of receptacles for Models L23, D23, L53, and D53 of the TS3500 Tape Library
130
IBM System Storage TS3500 Tape Library with ALMS: Introduction and Planning Guide
Summary of Contents for System Storage TS3500
Page 1: ...IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide GA32 0593 07...
Page 6: ...vi IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 8: ...viii IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 14: ...xiv IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 18: ...xviii IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 24: ...xxiv IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 114: ...90 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 156: ...132 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 196: ...172 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 234: ...210 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 238: ...214 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 246: ...222 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 254: ...230 IBM System Storage TS3500 Tape Library with ALMS Introduction and Planning Guide...
Page 289: ......
Page 290: ...Printed in USA GA32 0593 07...