Note:
Each
SFP
has
a
10-pad
gold-plated
PCB-edge
connector
on
the
bottom.
The
correct
position
to
insert
an
SFP
into
the
upper
row
of
ports
is
with
the
gold
edge
down.
The
correct
position
to
insert
an
SFP
into
the
lower
row
of
ports
is
with
the
gold
edge
up.
2.
Slide
the
SFP
into
the
port
until
you
feel
it
click
into
place;
then
close
the
bail.
Item
Description
A
Switch
chassis
B
SFP
with
open
bale
C
SFP
1
2
A
A
D
B
C
!
B24_0004
Figure
11.
SFP
installation
and
bail
closing
Chapter
3.
Operating
the
switch
27
Summary of Contents for SAN40B-4 - System Storage Switch
Page 2: ......
Page 8: ...vi SAN40B 4 Installation Service and User s Guide...
Page 10: ...viii SAN40B 4 Installation Service and User s Guide...
Page 24: ...xxii SAN40B 4 Installation Service and User s Guide...
Page 44: ...20 SAN40B 4 Installation Service and User s Guide...
Page 64: ...40 SAN40B 4 Installation Service and User s Guide...
Page 77: ......
Page 78: ...Part Number 45W0859 Printed in USA GA32 0581 00 1P P N 45W0859...