Installing a power supply
Complete the following steps to install a power supply.
1.
Remove any filler panels that were temporarily installed.
2.
Insert the power supply into the slot. Verify that the power supply is seated by
gently pulling on the handle. The power supply should resist movement as you
pull.
3.
Tighten the thumbscrew.
4.
Connect the power cord.
5.
Move the power supply switch to the on position.
6.
Verify that the power LED on the power supply displays a steady green light.
Removing and installing a blower assembly
This procedure provides instructions for removing and installing a blower
assembly.
Attention:
The system can continue operating during the replacement if the
second blower assembly is operating, To ensure continuous adequate cooling,
maintain both blower assemblies except for the brief period during replacement.
Time and items required
The installation procedure for each blower assembly takes less than 5 minutes. The
following items are required for the blower assembly installation:
v
Replacement blower assembly
v
#2 Phillips screwdriver
384b022
Figure 38. Removing and installing a power supply
86
SAN384B-2 Installation, Service, and User Guide
Summary of Contents for SAN384B-2
Page 2: ......
Page 8: ...vi SAN384B 2 Installation Service and User Guide ...
Page 12: ...x SAN384B 2 Installation Service and User Guide ...
Page 14: ...xii SAN384B 2 Installation Service and User Guide ...
Page 16: ...xiv SAN384B 2 Installation Service and User Guide ...
Page 28: ...xxvi SAN384B 2 Installation Service and User Guide ...
Page 32: ...xxx SAN384B 2 Installation Service and User Guide ...
Page 82: ...50 SAN384B 2 Installation Service and User Guide ...
Page 146: ...114 SAN384B 2 Installation Service and User Guide ...
Page 172: ...140 SAN384B 2 Installation Service and User Guide ...
Page 188: ...156 SAN384B 2 Installation Service and User Guide ...
Page 189: ......
Page 190: ... Part Number 98Y2654 Printed in USA GA32 0894 03 1P P N 98Y2654 ...