1
Rear of rail
2
Rack mounting rails
3
M6 screws
4
Latches
5
Front of rail
Note:
You might find it helpful, with some types of racks, to remove the rack doors and side panels
to provide easier access during installation.
2.
Check the labels on the support rails. Each rail has a label that indicates which is the front end of the
rail and whether the rail is for the left or right side of the rack. Perform this procedure for both rails.
3.
Insert the right slide rail
2
into the rear rack mounting flange, as shown in Figure 57, with the rail
pins
1
protruding through the flange.
4.
Extend the right slide rail
2
and insert it into the front rack mounting flange, as shown in Figure 58
on page 74, with the rail pins
1
protruding through the flange. Insert the left slide rail in the same
way.
Figure 56. SAN Volume Controller 2145-8G4 support rails installation kit
2
svc00240
Figure 57. Inserting the right slide rail into the rear rack mounting flange
Chapter 2. Removing and replacing parts
73
Summary of Contents for SAN Volume Controller 2145-CG8
Page 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 2: ......
Page 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 371: ......
Page 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...