Figure 3. Pushing the rails into the rear rack flanges until they click into place
3. Swivel the rail retention bracket out (3) and pull the front of the rail toward the front of the rack, until
the pins are aligned with the correct holes in the rack (4).
Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or
IBM Power System H922S (9223-22S) 5