5.
Place the cable on the table.
Replacing the disk and fan signal cable in the 8335-GTB system
Follow these steps to replace a disk and fan signal cable in the IBM Power System S822LC (8335-GTB)
system.
Procedure
1.
Ensure that you have the electrostatic discharge (ESD) wrist strap attached. If not, attach it now.
2.
Using the labels, connect the disk and fan signal cable (A) to the disk drive and fan card (B) and to
the system backplane (C). Ensure that the cable latch clip snaps into place on the connectors. See
Figure 56 on page 46.
Figure 55. Removing the disk and fan signal cable
Removing and replacing parts in the IBM Power System S822LC (8335-GTB)
45
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...