![IBM RPQ 7L1184 Installation And Maintenance Information Download Page 10](http://html1.mh-extra.com/html/ibm/rpq-7l1184/rpq-7l1184_installation-and-maintenance-information_3291347010.webp)
Step 4 Power supply part number
– Check that the part number written on the transformer assembly is con-
sistent with “Transformer Assembly Part Number” on page 1-8
Step 5 Grounding
– Check that electrical continuity is assured between the ground wires of the
power cords and between those ground wires and the frame ground.
Step 6 Cover
– The transformer assembly is a sealed unit. Check that the rivets are in
place and have not been forced.
viii
RPQ 7L1184
Summary of Contents for RPQ 7L1184
Page 2: ......
Page 6: ...iv RPQ 7L1184...
Page 8: ...vi RPQ 7L1184...
Page 21: ......
Page 22: ...IBM Part Number 26F1485 Printed in U S A 26F1485 SY33 2 78 3...