![IBM Power Systems 7063-CR1 Service Manual Download Page 24](http://html1.mh-extra.com/html/ibm/power-systems-7063-cr1/power-systems-7063-cr1_service-manual_3330678024.webp)
d.
The rebuild operation can take several hours. Check the status of the rebuild operation by running
the following command from the
mvcli
command line:
info -o vd
If the rebuild is "paused", restart the rebuild operation by running the following command for a
disk drive in the first drive bay:
rebuild -a resume -l 0 -d 1
Or by running the following command for a disk drive in the second drive bay:
rebuild -a resume -l 1 -d 0
Removing and replacing the disk drive backplane in the 7063-CR1
Learn how to remove and replace the disk drive backplane in the IBM 7063-CR1 Hardware Management
Console system.
About this task
Attention:
The following procedures describe the removal and replacement of the disk drive backplane.
Only an authorized service representative must remove or replace this part.
You can use a commercially available magnetic tip screwdriver to remove and replace the screws.
Removing the disk drive backplane from the 7063-CR1
Learn how to remove the disk drive backplane from the IBM 7063-CR1 Hardware Management Console
system.
Before you begin
Power off the system and place it in the service position. For instructions, see “Preparing the 7063-CR1
system to remove and replace internal parts” on page 66.
Procedure
1.
Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an
unpainted metal surface until the service procedure is completed, and if applicable, until the service
access cover is replaced.
Attention:
v
Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to
an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging
your hardware.
v
When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock when
using or working on electrical equipment.
v
If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum of
5 seconds. If at any point in this service process you move away from the system, it is important to
again discharge yourself by touching an unpainted metal surface for at least 5 seconds before you
continue with the service process.
2.
Label and remove the drive signal cables (A), the operator console cable (B), and drive power cable
(C)
from the system backplane as shown in Figure 5 on page 9. Using your thumb, press the release
latch on the connector to remove the cable.
8
Power Systems: Servicing the 7063-CR1 Hardware Management Console system
Summary of Contents for Power Systems 7063-CR1
Page 1: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 16: ...xiv Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 76: ...60 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 98: ...82 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 110: ...94 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 111: ......
Page 112: ...IBM Printed in USA ...