Figure 26. Replacing the air baffle
Preparing the 9009-22G or 9223-22S system for operation after removing
and replacing an NVMe U.2 pass-thru card
To prepare the system for operation after removing and replacing an NVMe U.2 pass-thru card, complete
the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Slide the service access cover (A) onto the system unit.
3. Close the release latch (B) by pushing it in the direction shown.
30 Power Systems: NVMe U.2 pass-thru cards for the 9009-22G or 9223-22S
Summary of Contents for Power System 9009-22G
Page 1: ...Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 64: ...50 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 74: ...60 Power Systems NVMe U 2 pass thru cards for the 9009 22G or 9223 22S...
Page 75: ......
Page 76: ...IBM...