Figure 32. Disconnecting the water hoses
3. Remove the screws on either side of the system that secure the system to the rack.
4. While one person is supporting the weight of the front of the system, have the second person move to
the rear of the system and push the system partially out of the rack.
5. Position one person on the left side of the system and one person on the right side of the system.
6. Tilt and lift the system from the rails.
7. Carefully set the system on a table with an appropriate ESD surface.
Placing an 8335-GTC, 8335-GTG, 8335-GTH, 8335-GTW, or 8335-GTX
system into the operating position
To place a system into the operating position, complete the steps in this procedure.
About this task
Pick the proper type of rails for your system:
• “Slide rails” on page 46
• “Fixed rails” on page 47
Common procedures for servicing or installing features in the 8335-GTC, 8335-GTG, 8335-GTH, 8335-GTW, or
8335-GTX system 45
Summary of Contents for OpenCAPI
Page 4: ...iv ...
Page 16: ...2 Power Systems Installing and Servicing the OpenCAPI adapter support for the 8335 GTH system ...
Page 81: ......
Page 82: ...IBM ...