24. Reinstall the top cover.
a. Check that all cables, adapters, and other components are installed and seated correctly and that
you have not left loose tools or parts inside the server.
b. Lower the cover with the rear edge of the cover approximately 2.5 cm (1 in.) back from the rear
edge of the server.
c. Slide the cover forward.
d. Tighten the two thumbscrews on the back edge of the cover.
25. Go to “Completing the upgrade installation.”
Completing the upgrade installation
Information on the following pages will guide you in completing the hardware installation and installing the
necessary software for this processor upgrade.
Updating the system configuration
Complete this procedure.
1. Connect the power cord to the power supply.
2. Connect all other server and device cables and connectors.
3. Turn the server power on.
4. Watch the monitor screen. The system automatically accesses the Configuration/Setup program.
5. Select Save Settings and exit the Configuration/Setup program.
6. Insert the
HardwareGuide CD that comes with the IBM Netfinity 5500 M20 Server Library contained in
this option package, into the CD-ROM drive. If necessary, refer to the
Server Library for information
on using the
HardwareGuide CD.
7. Restart the server.
8. Go to “Updating the system diagnostic programs” on page 22.
Upgrade installation
21
Summary of Contents for Netfinity Series
Page 1: ...IBM Netfinity Four Way Processor Upgrade Kit Installation Instructions ...
Page 2: ......
Page 3: ...IBM Netfinity Four Way Processor Upgrade Kit Installation Instructions ...
Page 8: ...vi Processor Upgrade Instructions ...
Page 43: ......
Page 44: ...IBM Part Number 01K7672 Printed in U S A ð1K7672 ...