7.
Repeat steps 5 on page 59 through 6 on page 60 to install the opposite rail.
8.
Install the expansion enclosure in the rack, as described in “Installing or
replacing an expansion enclosure in a rack: 2145-92F.”
Installing or replacing an expansion enclosure in a rack: 2145-92F
Use the following procedure to place the 2145-92F expansion controller in a rack
during the installation process. To complete some service tasks, you might also
need to slide the enclosure back in to the rack.
svc01022
Figure 56. Example of required rack space
Chapter 4. Installing an optional 5U SAS expansion enclosure
61
Summary of Contents for MTM 2145-SV1
Page 8: ...viii SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 26: ...xxvi SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 72: ...38 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 192: ...158 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 194: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 196: ...162 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 200: ...166 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 208: ...174 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 212: ...178 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide ...
Page 213: ......
Page 214: ...IBM Printed in USA GI13 4547 02 ...