– Controllers (2), if you ordered 1818-80C
– ESMs (2), if you ordered 1818-80E
v
Handles (4), packaged in a smaller box inside the shipping box
v
DDMs (20 or more, depending on your order), packaged in a smaller box inside the shipping box
v
Bezel (1)
v
Rack-mounting hardware kit (1), packaged in a smaller box inside the shipping box, including:
– Rails (2), right and left assembly
– Rear brackets (2)
– M5 black hex-head slotted screws (16)
Note:
The screws are either preinstalled in the support rails or packaged in a plastic bag.
– Washers (8)
– Clip nuts (4)
Important:
The DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module
Controllers do not ship with region-specific ac power cords. You must obtain the
IBM-approved power cords for your region. See the
IBM System Storage DCS3700 Storage
Subsystem and DCS3700 Storage Subsystem with Performance Module Controllers Installation,
User's, and Maintenance Guide.
for more information.
Tools
Before you install the storage enclosure, the installation area must have an Internet connection, and you
must have the following tools:
v
A lift tool to hold the storage enclosure and its components
v
Labels for the cable connectors
v
A medium flat-blade screwdriver
v
A No. 2 Phillips screwdriver or an M5 hex driver
v
Anti-static protection
7