background image

– Controllers (2), if you ordered 1818-80C
– ESMs (2), if you ordered 1818-80E

v

Handles (4), packaged in a smaller box inside the shipping box

v

DDMs (20 or more, depending on your order), packaged in a smaller box inside the shipping box

v

Bezel (1)

v

Rack-mounting hardware kit (1), packaged in a smaller box inside the shipping box, including:
– Rails (2), right and left assembly
– Rear brackets (2)
– M5 black hex-head slotted screws (16)

Note:

The screws are either preinstalled in the support rails or packaged in a plastic bag.

– Washers (8)
– Clip nuts (4)

Important:

The DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module
Controllers do not ship with region-specific ac power cords. You must obtain the
IBM-approved power cords for your region. See the

IBM System Storage DCS3700 Storage

Subsystem and DCS3700 Storage Subsystem with Performance Module Controllers Installation,
User's, and Maintenance Guide.

for more information.

Tools

Before you install the storage enclosure, the installation area must have an Internet connection, and you
must have the following tools:

v

A lift tool to hold the storage enclosure and its components

v

Labels for the cable connectors

v

A medium flat-blade screwdriver

v

A No. 2 Phillips screwdriver or an M5 hex driver

v

Anti-static protection

7

Summary of Contents for DCS3700

Page 1: ...installation of the storage enclosure involves the following procedures 1 Installation guidelines 2 Ordering the lift tool on page 4 3 Unpacking the shipping box on page 5 4 Installing the support ra...

Page 2: ...grounded outlet The storage enclosure accepts only 200 V 240 V input sources If you do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that...

Page 3: ...00 Storage Subsystem and DCS3700 Storage Subsystem with Performance Module Controllers Installation User s and Maintenance Guide for additional information 2 Before you move or relocate a rack that co...

Page 4: ...employees with access to the IBM intranet For the SSR branch and territory the United States cannot order the lift tool through the parts ordering system UPS Logistics is used to ship and return the l...

Page 5: ...ve the DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers from the shipping box at this time v Six full or empty boxes of DDMs Note The DDMs are packaged ten pe...

Page 6: ...ule Controllers your shipping box might contain additional materials that are not shown in the following illustration Support rails Storage enclosure M5 x 8 mm screws 16 PDU jumper cord Rear brackets...

Page 7: ...he DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers do not ship with region specific ac power cords You must obtain the IBM approved power cords for your regi...

Page 8: ...rmance Module Controllers 1 Ensure that the rack has already been installed 2 Ensure that a stabilizer has been attached correctly to the bottom front of the rack to prevent the rack from tipping forw...

Page 9: ...t insert two M5 screws with washers through the rear of the cabinet and screw them into the support rail rear flange 9 Tighten the two rail adjustment screws with a medium flat blade screwdriver 10 Re...

Page 10: ...om of the handle in the opening in the storage enclosure chassis and push the handle in and up until the latch at the top of the handle secures the handle to the chassis 3 Repeat step 2 for the three...

Page 11: ...imum of two trained service technicians are required to push the enclosure out of its custom designed package and onto the lift tool If a lift tool is not available see Appendix E Component weights in...

Page 12: ...en all of the M5 screws to secure the rear of the storage enclosure to the rack cabinet 8 Turn the rear bracket thumbscrews to attach the rear brackets to the sides of the storage enclosure The screw...

Page 13: ...subsystem and DCS3700 storage subsystem with Performance Module Controllers but the DDMs are shipped separately from the drive drawers 2 Ensure that you install the storage enclosure in the rack cabin...

Page 14: ...DMs in the front row of the drive drawer 6 Push the drive drawer into the storage enclosure until it clicks and close the levers on each side of the drawer Attention Ensure you push both levers back a...

Page 15: ...u do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that they can handle the DCS3700 or DCS3700 storage subsystem with Performance Module...

Page 16: ...workstation and locate the applicable directory for your operating system Note The type of operating system that the management station runs is the directory that you must locate on the DS Storage Ma...

Page 17: ...ler A is 192 168 128 101 v Port 2 on controller A is 192 168 129 101 v Port 1 on controller B is 192 168 128 102 v Port 2 on controller B is 192 168 129 102 v The subnet mask for both Ethernet ports i...

Page 18: ...tion and click Continue Note For detailed information about device driver and firmware versions ensure that you read the readme files that are posted with each package Updating the storage subsystem f...

Page 19: ...1U 0U 0U Rail assembly front left Rail assembly front right FRONT Rack Mounting Template 4U 4U Install second Install first Install second Install first Install first Install first Install second Ins...

Page 20: ...3U 3U 2U 2U 1U 1U 0U 0U Rail assembly rear left Rail assembly rear right Printed in the U S A REAR Rack Mounting Template Rail mounting guide 4U 4U Rear bracket Rear bracket 20...

Page 21: ...ed States other countries or both Microsoft and Windows are trademarks of Microsoft Corporation in the United States other countries or both Copyright IBM Corporation 2012 US Government Users Restrict...

Reviews: