__ b.
Press the Increment/Decrement push button until
02
appears
in the Function/Data display.
__ c.
Press the Enter push button on the control panel.
__ d.
Press the Increment/Decrement push button until
B
appears
in the Function/Data display.
__ e.
Press the Enter push button on the control panel.
__ f.
Press the Increment/Decrement push button until
S
appears
in the Function/Data display
__ g.
Press the Enter push button on the control panel.
__ h.
Press the Mode Select button until the Normal indicator
(
OK
) lights up.
__ i.
Press the Increment/Decrement push button until
01
appears
in the Function/Data display.
__ j.
Press the Enter push button on the control panel.
01 B S
should appear in the Function/Display display. If it
does appear, not repeat steps 18a on page 6 through 18i.
__ 19.
Press the Power push button that is located on the AS/400 control panel.
There is approximately a 10 second delay before the power-on light comes
on, and data appears in the Function/Data display.
Note:
The system takes approximately 5 to 20 minutes to power on and
complete an IPL. When the IPL is complete,
01 B N S
appears in the
Function/Data display.
__ 20.
Place the EZ-Setup CD in your PC’s CD-ROM drive and select EZ-Setup.
__ 21.
Plug in and power on all attached devices, such as printers and displays
when Operations Console is operating.
Upgrading Twinaxial Console to Operations Console
7
Summary of Contents for AS/400e 270
Page 2: ......
Page 19: ...PCI card locations 270 System Unit Copyright IBM Corp 2000 13...
Page 25: ......