6.3
Align the latch
with the rail on the right and snap the latch onto the rail.
D
6.1
Insert the cable-management arm
into the four slots
in the back of the server.
A
B
6.2
When the cable-management arm is seated into all four slots, slide the cable-
management arm to the left, and lock it into place by pulling the locking cam
back, away from the server.
C
6
Install the cable-management arm
Tip:
After you have cabled your server, use the straps that are attached to the
cable-management arm to secure the cables.
You have finished installing the server into the rack. Go to task 10
.
Cable the HMC
and the server
B
D
B
C
A
Tip:
If space is limited inside the rack, slide an adjacent server out partway to
install the cable-management arm.