background image

 
 

© Copyright IBM Corporation 2019, 2020.               Customer Install Guide, 2U Chassis 

13 

 or 

 or 

 

DANGER

: Multiple power cords. The product might be equipped with multiple AC power 

cords or multiple DC power cables. To remove all hazardous voltages, disconnect all 
power cords and power cables. (L003)

 

 

Product Safety Notifications, Japan 

 

(English translation: If this product comes with power cords, such cords should 
be used exclusively for the applicable product, but not for other devices.)

 

 

 

(English translation: After providing the main product, if additional power cord is 
required, the cord is handled for repair/maintenance/mending purpose.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

            

 

                            

Summary of Contents for 3453 Series

Page 1: ...system Customer Install Guide Chassis 3453 XXX Version 1 6 Note Before using this information and the product it supports read the information in Safety notices on page 5 Notices on page 36 the IBM S...

Page 2: ...2U Chassis 2 This edition applies to IBM Cloud Pak for Data System Components Revised February 2020 Copyright IBM Corporation 2019 2020 US Government Users Restricted Rights Use duplication or disclo...

Page 3: ...em 2U server chassis 16 Operating Environment 17 Rack Requirements 18 Rack Space 18 Location in the Rack 19 Package Contents 22 Chassis Installation Procedure 23 Rack rail parts inventory 23 Install s...

Page 4: ...kkerhedsforskrifterne f r du installerer dette produkt Lees voordat u dit product installeert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Inform...

Page 5: ...this documentation is labeled with a number This number is used to cross reference an English language caution or danger statement with translated versions of the caution or danger statement in the Sa...

Page 6: ...he outlet supplies proper voltage and phase rotation according to the system rating plate For racks with a DC power distribution panel PDP connect the customer s DC power source to the PDP Ensure that...

Page 7: ...s from the connectors Remove all cables from the devices To connect Turn off everything unless instructed otherwise Attach all cables to the devices Attach the signal cables to the connectors For AC p...

Page 8: ...evice Use of the controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure C026 IBM servers can use I O cards or features that...

Page 9: ...nformation laser radiation when open Do not stare into the beam do not view directly with optical instruments and avoid direct exposure to the beam C030 R001 part 1 DANGER Observe the following precau...

Page 10: ...e when directed to disconnect power during servicing Connect all devices installed in a rack cabinet to power devices installed in the same rack cabinet Do not plug a power cord from a device installe...

Page 11: ...s this label attached Do not open any cover or barrier that contains this label L001 L002 DANGER Rack mounted devices are not to be used as shelves or work spaces Do not place objects on top of rack m...

Page 12: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 2U Chassis 12 L003 or or...

Page 13: ...all hazardous voltages disconnect all power cords and power cables L003 Product Safety Notifications Japan English translation If this product comes with power cords such cords should be used exclusiv...

Page 14: ...omer Install Guide Power Distribution Unit PDU 3454 FCE FCG 13 03GJ009 Customer Install Guide 1U Chassis 3455 XXX 14 29R2409_Important_Notices 15 G229 9054 IBM Systems Safety Notices translations Pub...

Page 15: ...plied PDUs meeting the power requirements of the Cloud Pak for Data System components If this is a customer install IBM installation services will wire and power the system once all racks power and co...

Page 16: ...Notes 1 2 Table 1 Width Depth Height EIA units Weight Amperage Max Power Max Cooling Max 488 mm 19 3 in 891 5 mm 35 1 in 87 mm 3 5 in 2 55 kg 121 2 lb 10 amps 2000 watts 6800 BTU Hr Notes 1 The power...

Page 17: ...50F 95F 1 5 5C 45C 41F 113F Humidity 25 60 noncondensing 2 4 20 80 noncondensing 2 4 8 85 4 Maximum Operating Altitude 3050m 10 000 ft 1 Shipping Temperature 40C 60C 40F 140F 3 4 Shipping relative hum...

Page 18: ...ormation on the space requirements for the rack which will house the Cloud Pak for Data System Components Rack Space Ensure that the rack in which you plan to install the system meets the space requir...

Page 19: ...the lengths of the supplied cables are not exceeded Figure 2 Front view of installed base Cloud Pak component locations 42 4U Blank Panel 41 40 39 38 2U Blank Panel 37 36 2U Blank Panel 35 34 PDU 2 R...

Page 20: ...dditional PDUs should be installed above the PDUs at locations U35 U36 Other components should be installed per the specific install guide included with those components Installation Notes Server node...

Page 21: ...nk Panel 29 1G Switch 28 1G Switch 27 1U Blank Panel 26 25G Switch 25 25G Switch 24 1U Blank Panel 23 1U Blank Panel 22 1U Blank Panel 21 1U Blank Panel 20 1U Blank Panel 19 1U Blank Panel 18 1U Blank...

Page 22: ...udes the following parts Two power cords Slide box kit The slide box kit includes the following parts One right slide One left slide Two M5 screws Two washers I O kit DO NOT DISCARD Keep with chassis...

Page 23: ...ack Read the Rack safety notices Pub G229 9054 included with the unit C010 This unit weighs approximately 121 2lb 55kg IBM recommends the use of an appropriate lifting device to position the chassis o...

Page 24: ...hown in the following illustration Procedure 1 Select the first slide rail you want to install Figure 4 2 Make sure the slide rail is shortened to the shortest position 3 From the front of the rack ca...

Page 25: ...flange holes at the front of the rack Figure 6 Note The holes on the rack will either be square shaped or round shaped Figure 6 Left slide front installation 6 Repeat steps 2 to 5 to install the other...

Page 26: ...hey must not be removed from the chassis during the chassis installation process Figure 7 Node locations in chassis and chassis marking To install the enclosure on the rails complete the following ste...

Page 27: ...nclosure 5 Tilt and lower the enclosure then push the slides toward the enclosure and make sure the farthest nailheads go into the slots on the slides Figure 10 6 Slowly lower the enclosure down and m...

Page 28: ...is critical for effective installation for reliability of operation and for ease and effectiveness of service The cable management arms allow for orderly routing of cables in system racks they enable...

Page 29: ...einstalling it on the opposite side of the tray pins See Figures 12 13 14 Figure 12 Cable management arm right orientation must be reversed to left orientation Figure 13 Left attachment tab pin Figure...

Page 30: ...ce ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD AIR INLETS DO NOT BLOCK ANY INLET OR EXHAUST DUCTS VENTS OR PORTS KEEP ALL POWER...

Page 31: ...is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Properly shielded and grounded cables and connectors must be used in orde...

Page 32: ...any failure to satisfy the protection requirements resulting from a non recommended modification of the product including the fitting of non IBM option cards This product may cause interference if us...

Page 33: ...Install Guide 2U Chassis 33 This statement applies to products greater than 20 A per phase three phase JIS C 61000 3 2 Japan Voluntary Control Council for Interference VCCI Notice A Korea Notice Peop...

Page 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 2U Chassis 34 Taiwan Notice IBM Taiwan Contact Information...

Page 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 2U Chassis 35 Regulatory and Compliance...

Page 36: ...d services offered in the U S A IBM Director of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte DBCS information contact the IBM Int...

Page 37: ...er terms of the IBM Customer Agreement IBM International Program License Agreement or any equivalent agreement between us Any performance data contained herein was determined in a controlled environme...

Page 38: ...ata and reports used in daily business operations To illustrate them as completely as possible the examples include the names of individuals companies brands and products All of these names are fictit...

Page 39: ...ams conforming to the application programming interface for the operating platform for which the sample programs are written These examples have not been thoroughly tested under all conditions IBM the...

Page 40: ...ther countries Microsoft Windows Windows NT and the Windows logo are trademarks of Microsoft Corporation in the United States other countries or both Linux is a registered trademark of Linus Torvalds...

Page 41: ...hnical questions and information about products and prices please contact your IBM branch office your IBM business partner or your authorized remarketer When you send comments to IBM you grant IBM a n...

Page 42: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 2U Chassis 42...

Page 43: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 2U Chassis 43 Part Number 03GJ005 Printed in Mexico...

Reviews: