
© Copyright IBM Corporation 2020, 2021. Customer Install Guide, Connector Node
22
Package Contents
The shipping carton contains:
•
Chassis (enclosure)
•
Cable management arm box
The cable management arm box includes the following parts:
– One cable management arm
– Velcro straps (pre-attached)
– Seven cable baskets (pre-attached)
– Three slide mounting clips
•
Cable box (
DO NOT DISCARD!)
- Keep with chassis after it is installed in the
rack
The cable box includes the following parts:
– Two power cords
•
Slide box kit
The slide box kit includes the following parts:
– One right slide
– One left slide
– Hardware
•
I/O kit (
DO NOT DISCARD!)
- Keep with chassis after it is installed in the rack
The I/O kit includes the following parts:
– Two blue RJ45 cables
– Two 100G Active Optical Cables
– One Safety DVD
– This document
Note: KEEP ALL POWER CORDS AND SIGNAL CABLES WITH THE
INSTALLED CHASSIS FOR USE BY IBM INSTALLERS.