3
Battery
plate
4
Front
panel
assembly
2145
UPS-1U
power
connector
2145
UPS-1U
cable
retention
bracket
The
2145
UPS-1U
cable
retention
bracket
ensures
that
the
power
cable
connection
between
the
2145
UPS-1U
and
the
SAN
Volume
Controller
2145-8F4
is
stable.
The
bracket
must
be
installed
after
you
install
the
2145
UPS-1U
in
the
rack.
You
can
attach
the
bracket
by
performing
the
following
steps:
1.
Install
the
power
cable
into
the
far-right
power
supply
on
the
rear
of
the
2145
UPS-1U.
2.
Remove
the
bracket
and
the
two
screws
from
the
packaging.
See
3.
Place
the
bracket
over
the
power
supply
inlets
on
the
right
rear
of
the
2145
UPS-1U,
so
that
the
two
screw
holes
line
up.
4.
Screw
in
the
two
screws
on
each
end
of
the
cable
retention
bracket.
See
Ground
Live
Neutral
svc00201
Figure
22.
The
2145
UPS-1U
cable
retention
bracket
hardware
34
IBM
System
Storage
SAN
Volume
Controller:
Installation
Guide
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Contents for 2145-4F2
Page 1: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Page 2: ......
Page 3: ...IBM System Storage SAN Volume Controller Installation Guide V ersion 4 1 0 GC26 7900 00...
Page 8: ...vi IBM System Storage SAN Volume Controller Installation Guide...
Page 74: ...44 IBM System Storage SAN Volume Controller Installation Guide...
Page 78: ...48 IBM System Storage SAN Volume Controller Installation Guide...
Page 120: ...90 IBM System Storage SAN Volume Controller Installation Guide...
Page 122: ...92 IBM System Storage SAN Volume Controller Installation Guide...
Page 128: ...98 IBM System Storage SAN Volume Controller Installation Guide...
Page 134: ...104 IBM System Storage SAN Volume Controller Installation Guide...
Page 138: ...108 IBM System Storage SAN Volume Controller Installation Guide...
Page 141: ......
Page 142: ...Part Number 31P0797 Printed in USA GC26 7900 00 1P P N 31P0797...
Page 143: ...Spine information IBM System Storage SAN Volume Controller Installation Guide Version 4 1 0...