![IBM 11000 VA LCD 5U Manual Download Page 4](http://html2.mh-extra.com/html/ibm/11000-va-lcd-5u/11000-va-lcd-5u_manual_3328741004.webp)
IBM 11000VA LCD 5U Rack Uninterruptible Power Supply
4
Supports IPv6 for future-proofing IP addressing and security.
z
Includes a graphical LCD display that lets you configure the device and displays important UPS status
z
information in one of nine languages:
English
z
French
z
German
z
Spanish
z
Russian
z
Korean
z
Japanese
z
Simplified Chinese
z
Traditional Chinese
z
Includes a real-time clock that enables precise shutdown and powerup of systems in preferred
z
sequence, and time stamping on event logs to track and record specific power-related occurrences.
Integrates with IBM Systems Director Active Energy Manager for power and thermal trending analysis
z
and management.
Has load segments that allow for individual control of receptacle groups, maximizing run time for
z
critical devices.
Supports an optional network management card (part number 46M4140) for enhanced UPS
z
monitoring and control.
Allows dual channel communication through the USB port and an optional Network Management
z
Card at the same time, which is an effective redundancy feature that maximizes communications
flexibility.
Supports an optional Extended Battery Module (EBM) for increased runtime requirements.
z
Includes a Remote Emergency Power Off (REPO) port to remotely power off the UPS unit to prevent
z
battery operation during a power failure.
Requires the following input power:
z
200 - 240 V ac, 50/60 Hz
z
Single-phase circuit with a 2-pole circuit breaker
z
63A (Europe) or 80A (North America) circuit
z
Includes hot swap batteries for maximum uptime, availability, and ease of maintenance.
z
Supports an optional Environmental Monitoring Probe (part number 46M4113) for thermal
z
management requirements (temperature and humidity), which requires that the Network Management
Card be installed.
Offers an Advanced Battery Management (ABM) three-stage charging technology, which significantly
z
extends battery service life and optimizes recharge time. The three stages are:
The battery is quickly charged to 90% to make sure the UPS is prepared for the next outage.
1.
ABM finishes charging the battery with a more moderate float charge.
2.
After the battery is charged, ABM turns the charger off, thereby preventing the batteries from
3.
being overcharged.