![IBC VFC 15-150 Manual Download Page 51](http://html2.mh-extra.com/html/ibc/vfc-15-150/vfc-15-150_manual_3303235051.webp)
4-1
MAINTENANCE
VFC 15-150 - VFC 45-225 MODULATING GAS BOILERS
MAINTENANCE
4.0
Boiler MaintenanCe
4.1.1 General Care
•
Keep combustible materials and flammable liquids and vapours away from the
boiler.
•
Keep vent terminals clear of obstructions (snow, dirt, etc.).
4.1.2 Inspection
Inspection of the boiler is to be performed annually by a qualified service
technician.
4.1.3 Venting
•
Check vent terminals for and remove any obstructions (e.g. leaves, dust,
other debris).
•
Check, and clean or replace intake air filters or screens as required.
•
Check for holes or leaks in venting. replace venting as needed.
•
examine for any signs of moisture caused by sweating intake air pipes;
insulate as required.
•
ensure proper resealing or reinstallation of venting on each servicing.
4.1.4 Condensate Traps
•
Open PVC union to drain, watching for mud / debris. Flush and refill.
•
if condensate neutralization is used, check pH level of condensate discharge.
4.1.5 burner
•
remove burner to inspect for extent of fouling. Blow clear using compressed
air. evaluate the magnitude of clearing required, and establish a reasonable
burner inspection schedule. some boiler / locations may call for annual
service, others showing clean burners will only need attention every 2 – 5
years. Consider adding air filtration if burner requires cleaning every year.
In alternate years, visually inspect burner through sight glass. Ensure flame
is stable and without excessive fluttering. Normal flame pattern is evenly
distributed over the burner surface.
•
if burner is operating improperly, remove and clean or replace. use a Co2
analyzer to determine proper combustion. Co2 level should be 9.0% (for
natural gas) or 10.2% (propane).
•
When re-installing burner, ensure it is inserted so that the seam (that runs
along the length of the metal-fibre surface) is placed as far away from the
ignitor as possible (180° rotation arc away). Also confirm spark gap is 1/8".
Confirm visually by removing viewport, turning gas supply OFF, and allowing
the boiler to run through an ignition cycle. Compare the spark length with the
spark rod diameter, which is the same 1/8" (e.g. use the rod as a reference).
4.1
CAUTION
Label all wires prior to
disconnection when servicing
controls. Wiring errors
can cause improper and
dangerous operation.
CAUTION
The owner is responsible for
general care of the boiler.
Improper maintenance of
the boiler may result in a
hazardous condition.
WARNING
Whenever the burner is
removed for inspection or
boiler servicing, the sealing
gaskets must be examined
and replaced if damaged.
Upon re-assembly, an
approved leak test solution
must be applied around the
burner flange sealing area to
ensure there is no leakage of
combustible gas/air premix.
WARNING
Fill trap with water before
boiler is first fired to prevent
exhaust fumes from entering
room. Never operate the
boiler unless the trap is filled
with water.
Failure to comply will result
in severe personal injury or
death.
Summary of Contents for VFC 15-150
Page 81: ...NOTES...
Page 82: ...NOTES...