IBC P-153 Replacement Instructions Manual Download Page 6

IBC Technologies Inc.

1-844-432-8422

|

www.ibcboiler.com

120-388E1

-

April 24, 2024

- Released Document

6 of 6

Reinstalling the burner and heat exchanger lid assembly

1. Carefully insert the lid-burner assembly straight down, ensuring that:

There is limited contact between the burner and refractory

The markings made previously on the lid, lid gasket, heat exchanger, and refractory are aligned.

2. Attach the heat exchanger lid and burner assembly onto the new heat exchanger with the six hex nuts

and perform the following:

a. Tighten nuts by hand in a cross pattern, similar to how the burner was tightened

b. Tighten an extra ½ to 1 turn.

Caution

Over-tightening will warp the heat exchanger lid and lid gasket, allowing fumes or
flames to leak.

3. Re-install the ignitor:

a. Position the ignitor gasket on the heat exchanger lid, aligning it with the screw holes.

b. Carefully insert the ignitor into the heat exchanger assembly by sliding it straight down.

c. Tighten the two #2 Phillips screws screws by hand, then an extra ⅛ turn.

4. Reconnect the following cables:

The ignitor cable

The gas valve cable

The two electrical connectors to the fan.

5. Reinstall the fan-gas valve assembly by following the above steps backwards from

Removing the fan

and gas valve assembly on page 4

.

6. Test for leaks at the gas valve inlet.

7. Restore the call for heat.

8. Test for proper operation.

9. Perform a combustion test.

Reviews: