IBC P-153 Replacement Instructions Manual Download Page 3

IBC Technologies Inc.

1-844-432-8422

|

www.ibcboiler.com

120-388E1

-

April 24, 2024

- Released Document

3 of 6

Boiler parts diagram

SL 20-115 G1

SL 20-115 G2

Item Number Description

Item Number Description

A

Fan

G

Burner gasket

B

Gas valve

H

Heat exchanger lid gasket

C

Gas supply line

I

Burner

D

Fan gasket

J

Refractory

E

Ignitor

K

Heat exchanger

F

Heat exchanger lid

Note

A ladder or step may be required to have a clear vertical view of the work area. Do not attempt to
remove the assemblies without a clear view, as damage to the connectors, screws or refractory
may occur.

Burner removal

Preparing the boiler for service

1. Remove call(s) for heat.

2. Remove power to the boiler at a wall switch or a breaker.

3. Shut off gas supply to the boiler.

Do not drain the boiler unless freezing conditions are expected during this procedure.

4. Allow the boiler to cool down to the ambient temperature.

5. Remove the front cover.

Reviews: