![IBC EX Series Installation & Operating Manual Download Page 100](http://html1.mh-extra.com/html/ibc/ex-series/ex-series_installation-and-operating-manual_3222196100.webp)
7.3.2 Replacing the gas valve in EX 700 and EX 850 models
Four (4) bolts connecting gas valve and mixing device. Keep gasket and bolts for re-
assembly.
Location of high gas pressure switch.
Gas valve inlet: Four (4) bolts of the flange. Keep gasket and bolts for re-assembly.
Low gas pressure switch.
Gas valve electrical connector
Gas valve outlet: Four (4) bolts of the flange. Keep gasket and bolts for re-assembly.
Supporting bracket for gas valve
Black tubing
Figure 71
Accessing the gas valve - EX 700, 850
1. Turn off the electric power and gas supply to the boiler.
2. Ensure that the boiler cools down to the surrounding temperature. Do not drain the boiler
unless freezing conditions are expected during this procedure.
98
Section: Service and maintenance
Summary of Contents for EX Series
Page 62: ...Intentionally left empty...
Page 80: ...Intentionally left empty...
Page 121: ...Appendices Wiring diagrams Figure 73 Controller electrical diagram 119 Appendices...
Page 122: ...Figure 74 Internal wiring diagram EX 400 and EX 500 models 120 Section Appendices...
Page 123: ...Figure 75 Internal wiring diagram EX 700 and EX 850 models 121 Wiring diagrams...
Page 124: ...Figure 76 Sequence of Operation 122 Section Appendices...
Page 126: ...Intentionally left empty...
Page 128: ...126 Boiler parts diagram EX 400 and EX 500...