Page 4
g)
The drain line must discharge into an open pipe at least 80mm diameter no
more than 3 metres from the unit. An air gap of 100mm should be allowed
for inspection and to conform to sanitary codes. Connect the 172 Valve
actuator drain line to the waste with 10mm tubing.
h)
Power supply is required not more than 0.5 metres from the unit and should
be a 3 pin 10a 240v 50Hz GPO preferably earth leakage protect.
Total power draw, 13 watts maximum.
i)
Minimum operating pressure 205 kPa (30psi), maximum operating pressure
690 kPa (100psi). If supply pressure is above 690 kPa, fit pressure reducing
valve. This must be a non-fluctuating supply. Maximum temperature of 58°C
j)
Slowly fill Softener Tank with water by placing control valve in backwash
position, turn off inlet isolating valve when tank fully vented of air. Refer to
start up procedure Page 4, of 172 Valve Installation, Operation &
Maintenance Manual.
Summary of Contents for AS30500
Page 13: ...Page 13 BRINE TANK SETUP ...
Page 14: ...Page 14 ...
Page 15: ...Page 15 Series 172 Commercial Industrial Control System Water Softener ...
Page 19: ...Page 19 ...
Page 20: ...Page 20 ...
Page 23: ...Page 23 ...
Page 25: ...Page 25 REPLACEMENT PARTS ...