AS1029MP-960
Page 6
20/11/2006
CONDENSED PROGRAMMING INSTRUCTION SHEET
Note:
For a full understanding of your water softener we advise that the instruction manual
provided with the softener should be fully read.
After the water softener has been fully installed with the correct amount of salt placed in the
brine cabinet or external brine tank it will be necessary to program into the 960
microprocessor, two functions to suit local conditions. It will be necessary to know the
‘hardness” of the water to be softened. If the water supply is from a municipal supply the
hardness can be obtained from the local “water authority”. If the water supply is from a bore
or non-municipal supply then the total hardness would be found from the water analysis
carried out when the softener was recommended.
•
The following will have to be programmed into the control
ð
Current time of day
ð
Hardness – of your local water supply
•
Plug transformer into main GPO.
•
Push lead end into socket underneath the front of the valve on left hand side corner
•
Check that the front dial camshaft position indicator (white line mark) is pointing to
“REGENERATION COMPLETE” position.
If not, turn power on at mains. The display will light up as “E r r 3” and the electric motor
will automatically drive the dial and cam around to the regeneration complete position.
What is now shown in the DISPLAY is an alternating “TIME OF DAY“ and “CAPACITY”
as indicated by a green light highlighting the relevant setting.
IF THE CURRENT DAY IS ‘AM’
•
To set the “TIME OF DAY”
Wait till the green light moves to the “TIME OF DAY” position
Immediately press “SET” button.
255-960 MICROPROCESSOR
CONTROL
þ
The clock function has been pre programmed as a 12 hour clock. Therefore if the
current time of day is in the morning, follow the instructions below: