10. Inspection
10.1 Inspection check points and timing
Please perform inspection checks according to the following timetable.
Running time is assumed to be 8 hours per day. If you run the system continuously day and night,then shorten the
maintenance interval accordingly.
10.2 Visual inspection of the actuator exterior
Check the following when doing the visual inspection.
10
Visual Inspection
Internal Check
Lubrication
Operation start
After 1 month of operation
After 6 months of operation
After 1 year of operation
Semiannually thereafter
Annually thereafter
❍
❍
❍
❍
❍
❍
❍
❍
❍
❍
❍
Actuator
Cables
General
Any loose mounting bolts?
Any damage, loose connection to connector?
Unusual noise or vibration?
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for FS
Page 3: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 25: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 26: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 27: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 28: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...