background image

 

 

Maintenance 

Routine visual inspection 

 
Smoking shelter equipment may be subject to heavy use or vandalism, weekly inspection of 
this type can be necessary. 

 
 
Examples of frame inspection points are: 

 
Cleanliness. 
 
Tightness of all fixings. 
 
Signs of corrosion or wear. 
 
Missing parts. 
 
Structural integrity.  
 
 

Maintenance of plastic sheeting: 

 
Wipe down regularly with warm soapy water using a non-abrasive cloth. 
 
Check for surface damage. 
 
Light scuffs and scratches can be repaired by dusting with hot air gun or pencil torch flame. 
 
Cracked or severely damaged panels should be removed and replaced. 

Summary of Contents for LONGTON SMOKING SHELTER

Page 1: ...S SQUARE HODDLESDEN DARWEN LANCASHIRE BB3 3NQ Tel 44 0 1254 703212 Fax 44 0 1254 707407 WEB www multihog co uk BF J000 0007 55 V1 3 SEP 2015 MOSSFIELD ROAD ADDERLEY GREEN STOKE ON TRENT STAFFORDSHIRE...

Page 2: ...1 General Dimensions Safety Stages of the installation may require the use of personal protection equipment When working at heights refer to HSE guidance Fig 1...

Page 3: ...he installer should ensure that the ground fixings are sufficient to secure the Longton smoking shelter to the foundations Fig 2 The Longton smoking shelter is supplied with bolt on legs to facilitate...

Page 4: ...il to side panels using M8 x 60mm socket button head screws Bolt the top roof struts to side panels using M10 x 70mm bolts The sequence of images is not representative of assembly order use as a guide...

Page 5: ...Frame Assembly 4 Bolt rear vertical struts to top rail using M10 X 80 bolts Fig 7 Bolt the rear vertical struts to bottom rail using M8 x 80 socket button head screws Fig 8 Fig 7 Fig 8...

Page 6: ...he framework is square Frame Assembly Fit the 40 x 40mm plastic caps to the front and rear roof rails Bolt roof beams to roof struts using M10 x 70mm bolts Bolt front and rear roof rails to roof beams...

Page 7: ...ew Drill until it starts to thread then remove and clean to remove all swarf See Fig 11 Pre drill 10mm holes in sheet first to match purlins Fix the sheet to the mid purlins using 5 5x32mm drill screw...

Page 8: ...t that you work from one end Make sure to allow a 10mm gap between the two sheets Pre drill 10mm holes in sheet first to match purlins Fix the sheet to the mid purlins using 5 5x32mm drill screws Dril...

Page 9: ...s are Cleanliness Tightness of all fixings Signs of corrosion or wear Missing parts Structural integrity Maintenance of plastic sheeting Wipe down regularly with warm soapy water using a non abrasive...

Page 10: ...9 Exploded Detail Fig 14...

Page 11: ...10 Bill Of Materials NOTE IAE do not supply ground fixings IMPORTANT Only use genuine IAE service parts when servicing IAE equipment...

Page 12: ...MOSSFIELD ROAD ADDERLEY GREEN STOKE ON TRENT STAFFORDSHIRE ST3 5BW TEL 44 0 1782 339320 FAX 44 0 1782 339321 WEB www iae co uk For further information contact your Authorised Dealer Dealer Stamp...

Reviews: