Plastic Installation
5
Before fitting the sheet, IAE advise that the mid purlins are pre drilled using a drill screw. Drill
until it starts to thread then remove and clean to remove all swarf. See Fig 11.
·
Make sure to allow a 10mm gap between the two sheets.
·
Pre drill ø10mm holes in sheet first to match purlins.
·
Fix the sheet to the mid purlins using 5.5x32mm drill screws.
Drill mid purlins to
accept.
Fig 11
Summary of Contents for CIRCONOMY
Page 10: ...Exploded Detail 9 Fig 15...