background image

INTERNATIONAL E-Z UP, INC.

1900 Second St., Norco, California 92860

800-45-SHADE

The #1 Instant Shelter

®

 Brand in the World

ezup.com

INSTRUCTIONS FOR

10’x10’ PREMIUM SHELTER PACK

(1) 10’x10’ Premium Frame, (1) Top, (3) Sidewalls, (1) Mid-Zip Sidewall (1) 4-Piece Spike Kit, (1) Wide-Trax

 Roller Bag

SET UP

Unpack and Open

A.

 Place your E-Z UP

®

 

Frame

 in the center of the area to be sheltered. 

B.

 With a partner on the opposite side of the 

Frame

, grasp two outer legs, lift the 

Frame

 slightly off the ground, and step backward while pulling 

the 

Frame

 to open.

C.

 Stop when the 

Frame

 is approximately 1/2 of its fully-opened size. 

(Fig. A)

D.

 Set the 

Frame

 back on the ground.

Attach Fabric Top

A.

 Gently unfold the fabric top, and place it over the semi-opened frame. 

B.

 Attach the fabric top to the E-Z UP

®

 frame by matching the 

Hook and Loop

 

Strips

 on the inside of the fabric top corners with the 

Hook and 

Loop Strips

 on each frame corner. 

(Fig. B)

 

C.

 Pull the fabric top down over the frame corners—pushing the 

Hook and Loop Strips

 firmly together.

Secure Top to Frame

A.

 Line up the grommet holes on the sides of the fabric top to the frame 

Top Attachment Points.

 The 

Top Attachment Points

 on the frame are 

denoted by the “

RED

” tags. 

(Fig. C)

B.

 Using a coin, unscrew the top attachment nut from the frame bolt. 

C.

 Place fabric top grommet on the frame bolt. 

D.

 Screw on top attachment nut and tighten until snug. Top fabric should rotate easily. 

Do Not

 over-tighten.

E.

 Repeat on each side.

OPEN E-Z UP

®

 Shelter

A.

 With a partner on the opposite side, grasp the bottom of the diamond-shaped area of 

Outer Trusses

(Fig. D)

B.

 Lift the frame up slightly and step backwards until the shelter is almost fully opened. Gently shake the shelter while opening. 

Be careful not to pinch fingers!

Secure Auto-Slider

®

 Pull Pin

A.

 Fold up the 

Fabric Top Corner

 to expose the 

Auto-Slider

®

 Pull Pin. (Fig. E)

B.

 Lift shelter corner slightly off the ground and engage the 

Auto-Slider

®

 Pull Pin

 by pushing up on the frame side trusses with one hand while 

holding down the top of the frame leg with the other hand. The pins will auto-engage when aligned with the holes on the frame legs

.

C.

 After the 

Auto-Slider

®

 Pull Pin

 has locked into place, pull the fabric top down over the frame leg, making sure to align and secure the hook 

and loop strips on the fabric top to the frame.

D.

 Repeat on all remaining corners.

Extend & Secure Frame Legs

A.

 With a partner, lift the two adjacent 

Outer Legs

 up off the ground simultaneously to about waist height. 

B.

 Slide the 

Lower/Inner Legs

 out until the 

Leg Adjustment Toggle

 buttons lock at selected height on each leg. 

(Fig. F)

Note: 

There are 3 adjustment settings on each leg. 

C.

 Repeat on the remaining legs.

Your E-Z UP

®

 shelter setup is now complete!

WHAT’S IN THE BOX

Fig. A

Fig. B

Fig. C

Fig. D

Fig. E

Fig. F

Fig. G

Fig. H

Top Attachment Point

Loop

Hook

Outer Trusses

Fabric Top Corner

Auto-Slider

®

 Pull Pin

Leg Adjustment
Toggle Button

Attaching Sidewalls to Shelter

In order to attach your sidewalls to your shelter, your shelter should be set up and in its intended location.

A.

 Slightly lift up the fabric valance corners on the side of the shelter from which you will begin to hang each sidewall.

B.

 Identify the top of the sidewall (includes four 

Truss Clips

). Attach each of the 

Truss Clips

 to the top truss on the shelter frame. Be sure the 

open side of each clip is facing into the shelter (not facing toward the outside). 

(Fig. G)

C.

 Secure the sidewall to the frame by attaching each 

Hook and Loop Strip

 to the outer leg.

D.

 Utilize E-Z 

Attachment Points

 to hang your gear.

Sidewall Rollup Features

Your shelter includes a 

Toggle and Loop

 feature that allows you to roll up and secure your sidewalls as needed.

A.

 Detach each edge of the sidewall from the frame legs by undoing the hook and loop strips.

B.

 Starting at the bottom, roll up the sidewall.

C.

 Secure the rolled up sidewall to the top of the frame truss by wrapping the toggle around one end and the loop around the other. Fit the toggle 

through the strip and twist to secure. 

(Fig. H)

D.

 Repeat on remaining sidewalls.

Hook & Loop

Truss Clip

Attachment 

Points

Toggle & Loop

Reviews: