background image

 

 

8-6 

 

6

 

ANTENNA 

Attach all antennas to the Gateway (one LoRa antenna for 8-channel gateways, two LoRa antennas for 

16-channel gateways). 

 

7

 

START UP 

Apply power to the PoE adapter.  The PWR LED indicator on the gateway should light up.   During 

bootup the gateway will search for a cellular connection and once connected the LTE LED indicator will 

begin to flash with data traffic.  The LoRa1 LED indicator will light solid when the system is up and 

running and ready to accept LoRa radio communication from WX sensor nodes 

8

 

OPERATION 

The WX gateway is provided fully provisioned and ready for operation.  There is no user adjustment of 

settings required for normal operation.  Monitoring of gateway operation is done by observing the 

status LEDs on the gateway bottom surface.  During normal operation the LEDs will show: 

PWR 

 on solid 

LTE 

 blinking periodically 

LoRa1 

 on solid 

If the LEDs do not indicate this status the gateway may be powered OFF then back ON.   Note that the 

gateway has a small amount of internal energy storage, so it is required to remove power for several 

minutes for it to fully power down.  Check the PWR led to ensure it is fully OFF before re-applying 

power. 

Summary of Contents for Smart Plant WX

Page 1: ...IAC 5200 Metcalf Avenue Overland Park KS 66202 USA iac intl com USA Canada 800 334 7431 Main Office 913 384 5511 Smart Plant Remote Monitoring Systems INSTALLATION GUIDE WX Outdoor Gateway...

Page 2: ...ision History Release 1 2022 11 15 IAC Form IAC IG 001 In case of emergencycall 911 For IAC afterhours troubleshootingandservice assistance contact IAC 24 7 CustomerSupportHotline Phone 913 834 5511 O...

Page 3: ...3 1 1 PURPOSE 1 3 1 2 INTENDED AUDIENCE 1 3 1 3 HOW TO USE THIS GUIDE 1 3 2 MOUNTING 2 4 2 1 PERFORMING INSTALLATION 2 4 2 2 MOUNTING STEP ONE 1 2 4 2 3 MOUNTING STEP TWO 2 2 4 3 CONNECT PoE ADAPTER 2...

Page 4: ...TENDED AUDIENCE This guide will be useful for all users of the WX Outdoor Gateway It will guide Operators and Maintenance personnel through mounting connection start up and operation 1 3 HOW TO USE TH...

Page 5: ...ble Electrical codes 2 2 MOUNTING STEP ONE 1 Fix the bracket included in the mounting kit on the bottom of the enclosure with four M6 12 screws 2 3 MOUNTING STEP TWO 2 Position and tighten the pole cl...

Page 6: ...riately rated weatherproof enclosure not provided 4 GROUNDING The gateway enclosure ground stud should be connected to a quality earth ground using at minimum 10AWG wire 5 LIGHTNING PROTECTION If the...

Page 7: ...dio communicationfromWX sensornodes 8 OPERATION The WX gatewayis providedfullyprovisionedandreadyfor operation There is no useradjustmentof settingsrequiredfornormal operation Monitoring of gatewayope...

Page 8: ...teway Installation Guide SmartPlantRemote Monitoring Systems Literature IAC IG 001 Release 1 2022 11 15 IAC 5200 Metcalf Avenue Overland Park KS 66202 USA iac intl com USA Canada 800 334 7431 Main Off...

Reviews: