background image

Page 

11

 of 

11

 

-

For physical installation setup refer to the next drawing.

Floor Anchor Installation 

Chapter 3

 

 TROUBLESHOOTING AND SUPPORT 

For Troubleshooting and Support, please contact 

HZ Security

 Inc.: 

Tel: 
Email: 
Website: 

+1.631.300.4000
techsupport@

turnstileshz

.com

 

http://www.

turnstileshz

.com

Summary of Contents for HZ-SWBS02

Page 1: ...INSTALLATION MANUAL FOR HZ SWBS02 SWING BARRIER TURNSTILES Revision Date Description Initials 0 2017 07 02 New template LR 1 2018 05 12 Manual update KN...

Page 2: ...Page 2 of 11 Index Chapter 1 INTRODUCTION 3 1 1 Product features 3 1 2 Product specifications 3 1 3 Product dimensions 4 Chapter 2 INSTALLATION 10 Chapter 3 TROUBLESHOOTING AND SUPPORT 11...

Page 3: ...ss steel Reader cut out or barcode reader insert 1 2 Product specifications The HZ SWBS02 swing barrier turnstiles have the following characteristics Power requirements 110Vac 220Vac 250W to 500W The...

Page 4: ...Page 4 of 11 1 3 Product dimensions Top View Single Movement Front View Single Movement...

Page 5: ...Page 5 of 11 Top View Single Movement ADA Front View Single Movement ADA...

Page 6: ...Page 6 of 11 Top View Double Movement Front View Double Movement...

Page 7: ...Page 7 of 11 Top View Double Movement ADA1 Front View Double Movement ADA1...

Page 8: ...Page 8 of 11 Top View Double Movement ADA2 Front View Double Movement ADA2...

Page 9: ...Page 9 of 11 Side View Four Lane Layout...

Page 10: ...ation codes Install one inch conduit for turnstile communication between two cabinets that form one lane Depending on the position each enclosure can host one or two motors The end cabinets have only...

Page 11: ...up refer to the next drawing Floor Anchor Installation Chapter 3 TROUBLESHOOTING AND SUPPORT For Troubleshooting and Support please contact HZ Security Inc Tel Email Website 1 631 300 4000 techsupport...

Reviews: