background image

Page 

10

 of 

11

 

Chapter 2

 

 INSTALLATION 

Before proceeding to the installation of the turnstile, unpack all components and check 

to make sure the all parts from the packing slip are included, verify dimensions and conduit runs. 

Use the turnstile template to properly align and lay out the site and to determine the right 

location of the floor stub-ups and anchors. 

Site preparation: 

-

Make sure that the floor is level before the installation process starts.

-

When measuring the distance between the cabinets always refer to the center of
the cabinets, not the corners.

-

Using the factory provided template and design layout drawings outline the exact
position  of  each  turnstile.  Make  sure  the  floor  outline  includes  the  space
dedicated to conduit stub-ups.

-

Install  conduits  for  low  voltage  cables  and  for  110Vac  (220Vac)  power.  Size
conduits based on the number of cables and follow local installation codes.

-

Install one ¾ inch conduit for turnstile communication between two cabinets that
form one lane.

-

Depending on the position, each enclosure can host one or two motors. The end
cabinets  have  only  one  motor  (SM  series)  and  the  middle  cabinets  have  two
motors (DM series).

-

Each controller operates one motor. SM series have one controller and DM series
have two controllers.

-

On the turnstile floor footprint, locate anchoring holes. Drill and install foundation
screw bolts or M12 anchor bolts.

-

Align and install the turnstile cabinet on the anchor bolts. Secure the cabinet to
the bolts.

-

Follow wiring diagram to terminate the cables on the turnstile control panel. The
following connections are required:

o

Card reader to control panel reader port. The control panel can be located
inside the turnstile or outside.

o

Communication cable between cabinets.

o

Lane OPEN command from the turnstile to the access control panel door
open relay.

o

If  required,  an  emergency  open  button  or  switch  can  be  wired  to  the
turnstile controller board.

o

110Vac (220Vac) is required for each turnstile cabinet.

Summary of Contents for HZ-SWBS02

Page 1: ...INSTALLATION MANUAL FOR HZ SWBS02 SWING BARRIER TURNSTILES Revision Date Description Initials 0 2017 07 02 New template LR 1 2018 05 12 Manual update KN...

Page 2: ...Page 2 of 11 Index Chapter 1 INTRODUCTION 3 1 1 Product features 3 1 2 Product specifications 3 1 3 Product dimensions 4 Chapter 2 INSTALLATION 10 Chapter 3 TROUBLESHOOTING AND SUPPORT 11...

Page 3: ...ss steel Reader cut out or barcode reader insert 1 2 Product specifications The HZ SWBS02 swing barrier turnstiles have the following characteristics Power requirements 110Vac 220Vac 250W to 500W The...

Page 4: ...Page 4 of 11 1 3 Product dimensions Top View Single Movement Front View Single Movement...

Page 5: ...Page 5 of 11 Top View Single Movement ADA Front View Single Movement ADA...

Page 6: ...Page 6 of 11 Top View Double Movement Front View Double Movement...

Page 7: ...Page 7 of 11 Top View Double Movement ADA1 Front View Double Movement ADA1...

Page 8: ...Page 8 of 11 Top View Double Movement ADA2 Front View Double Movement ADA2...

Page 9: ...Page 9 of 11 Side View Four Lane Layout...

Page 10: ...ation codes Install one inch conduit for turnstile communication between two cabinets that form one lane Depending on the position each enclosure can host one or two motors The end cabinets have only...

Page 11: ...up refer to the next drawing Floor Anchor Installation Chapter 3 TROUBLESHOOTING AND SUPPORT For Troubleshooting and Support please contact HZ Security Inc Tel Email Website 1 631 300 4000 techsupport...

Reviews: