INSTALLATION MANUAL 

Effective September 1, 2013

 

1. Introduction

 

·

 

This Installation manual contains information regarding the installation and the safe handling method 
of the photovoltaic module (hereafter referred to as “module”) supplied by Hyundai Heavy Industries 
Co., Ltd. (hereafter referred to as “HHI”). 

·

 

System Users and Installers should read and understand this guide before handling, installing the 
module. For any questions, please contact Customer Support department or our local representatives 
for more detailed information. 

·

 

Before installing a solar photovoltaic system, mechanical and electrical requirements for the total 
system should be checked as well. Keep this guide in a safe place for future reference. 

·

 

The installer should conform to every safety precautions specified in this guide and local codes when 
installing a module.   

·

 

HHI modules are tested and certified for installation worldwide. Different regions may have different 
regulations for solar PV installations. In this manual, hereafter “IEC only” is used to refer to regions 
where IEC standard applies, e.g. Europe, Middle East, most of Asia Pacific countries; “UL only” is 
used to refer to regions where UL standard applies, e.g. United States, Canada; all other references 
are global. 

 

2. General Information 

This manual provides the installation information for HHI modules. Each individual module has a 

unique serial number. 

 

Serial number : YYMMDD-XX-MxxxMG-0001(~9999) (Ex. 110317-21-M235MG-0001) 

 

·

 

YYMMDD : Production date 

·

 

XX : Production line 

·

 

MxxxMG : Model (xxx : module power range) 

·

 

0001(~9999) : Production number 

 

2.1   Disclaimer of Liability 

·

 

The information in this manual is based on HHI’s knowledge and experience and is believed to be 
reliable; but any information including product specification (without limitations) and descriptions do 
not constitute over a warranty. 

·

 

HHI reserves the rights for any change the technical specification including the PV production, the 
specifications, or the product information sheets without prior notice. 

·

 

The installation techniques, handling and use of this product are beyond company control. 

·

 

HHI does not have any responsibility and the liability for loss, damage, injury or expense resulting 
from improper installation, handling or use. 

 

Summary of Contents for HiS-MxxxMF

Page 1: ...egions may have different regulations for solar PV installations In this manual hereafter IEC only is used to refer to regions where IEC standard applies e g Europe Middle East most of Asia Pacific countries UL only is used to refer to regions where UL standard applies e g United States Canada all other references are global 2 General Information This manual provides the installation information f...

Page 2: ... directly to sunlight without connection each module generates over DC 30V which is potentially hazardous Modules are heavy Be sure to have more than two persons with anti slip gloves on carry each PV module Do not throw and drop PV modules Do not sit stand step walk and or jump on the module including the frames Do not drop or place objects on the modules Do not place excessive loads on the modul...

Page 3: ...ons for all other components within the total system 3 Installation 3 1 General Before installing and operating HHI PV system installer and operator should follow the requirements specified in this manual Do not drill additional holes in the frame of the modules This additional hole will void the warranty Refer to the mounting profile in Picture1 Picture2 Secure the module using mounting holes pro...

Page 4: ...n 1 General Operation Conditions The site condition for the sea level and wind load should be matched the following requirements 1 Sea level of site Below 1 000m 3 280ft 2 Maximum Instantaneous wind Speed Below 5 400Pa 5 400N m2 550kg m2 112lb ft2 on the front module surface Below 2 400Pa 2 400N m2 225kg m2 46lb ft2 on the back module surface If the wind strength is not over than 2 400Pa 2 400N m2...

Page 5: ...he most outer mounting holes If additional wind loads are anticipated for this installation additional mounting points should be used System designer and installer are responsible for load calculations and for proper design of support structure When installing modules in snowy area additional clamping or supporting parts should be attached to the middle of the lower long side frame to prevent poss...

Page 6: ...f 16 Sales Office 2nd Fl Hyundai Bldg 75 Yulgok ro Jongno gu Seoul 110 793 Korea Factory 313 Soi ro Soi myeon Eumseong gun Chungcheongbuk do 369 872 Korea Picture 2 HiS MxxxMG Hole Position Picture 3 Installation Method using bolt nut ...

Page 7: ...7 of 16 Sales Office 2nd Fl Hyundai Bldg 75 Yulgok ro Jongno gu Seoul 110 793 Korea Factory 313 Soi ro Soi myeon Eumseong gun Chungcheongbuk do 369 872 Korea Picture 4 Mounting Hardware Picture 5 Installation Method using clamping ...

Page 8: ...nt of Isc K 0 056 Output tolerance 3 0 Maximum system voltage Vdc 1 000 IEC 600 UL Cell quantity in series pcs 54 Bypass diodes pcs 3 Cell Type 6inches Multi crystalline Silicon Cell Safety Qualification Class IEC 61215 Class II Maximum Series Fuse Rating A 15 Fire Class rating Class C Electrical Characteristics HiS SxxxMF Mono Crystalline Si Type 3 Bus Bar Type 54 Cells Item HiS SxxxMF xxx Normal...

Page 9: ...ntity in series pcs 60 Bypass diodes pcs 3 Cell Type 6inches Multi crystalline Silicon Cell Safety Qualification Class IEC 61215 Class II Maximum Series Fuse Rating A 15 Fire Class rating Class C Electrical Characteristics HiS SxxxMG Mono Crystalline Si Type 3 Bus Bar Type 60 Cells Item HiS SxxxMG xxx Normal Power Value Normal Power Pmax 250 253 255 258 260 263 265 Voltage at Pmax Vmpp 30 5 30 5 3...

Page 10: ...ide This can resist nominal load on the module surface of 5 400Pa 5 400N m2 550kg m2 112lb ft2 at maximum 5 Wiring 5 1 General All wiring should be matched with proper electrical codes NEC USA or CEC Canada All wiring work should be done by a certified and authorized engineer All wiring should be connected safely in order to prevent any hazard All PV modules for one serial connection must be ident...

Page 11: ... To prevent electric shock and fire an earthing must be done on the frames of PV modules and array The array frame must be earthed according to NEC Article 250 USA or CEC Canada There is an earthing hole in the module frame by using these holes an earth conductor and the module frame must be connected and earthed See picture 6 Picture 6 Grounding Hardware 1 Grounding using Lay in Lug It is necessa...

Page 12: ...40 C 85 C 3 Wire Size 4 0mm2 AWG 12 4 The cable must not be bent or crushed on the direct exit of the cable screw joint A minimum bending radius R 5 x cable diameter must be maintained The cable must be routed in a way that tensile stress on the conductor or connections is prevented Picture 8 Cable Routing 5 7 Conduit For conduit application it is necessary to follow the regulation for outdoor ins...

Page 13: ...s surface only with no heated water only Normal water pressure is more than adequate Do not use harsh cleaning materials such as scouring powder steel wool scrapers blades or other sharp instruments to clean the glass surface of the module Use of such materials or cleaning without consultation will invalidate the product warranty PV modules that are mounted flat should be cleaned more often as the...

Page 14: ...d Fl Hyundai Bldg 75 Yulgok ro Jongno gu Seoul 110 793 Korea Factory 313 Soi ro Soi myeon Eumseong gun Chungcheongbuk do 369 872 Korea Picture 9 Standard module Layout Ground position HiS MxxxMF Picture 10 Standard module Layout Ground position HiS MxxxMG ...

Page 15: ...hi green com solar Page 15 of 16 Sales Office 2nd Fl Hyundai Bldg 75 Yulgok ro Jongno gu Seoul 110 793 Korea Factory 313 Soi ro Soi myeon Eumseong gun Chungcheongbuk do 369 872 Korea Picture 11 Junction box ...

Page 16: ...ibed in Hyundai Heavy Industries installation Manual are covered by 2 400Pa Warranty Method 2400 Pa 5400 Pa Bolting Long Bar Clamping Clamping area Additional support bar area Additional Clamping area for slipping snow Long Bar Clamping Area L 4 L 8 Clamping Area L 4 Short Bar Clamping Area S 4 S 8 Clamping Area S 4 Note 1 The certified mounting method is bolting method by TÜV Rheinland 2 The Moun...

Reviews: