S709/8
INSTALLATION INSTRUCTIONS
1. Check you have the following items:
1 off Alpha pump for AdBlue®
1 off delivery hose
1 off front door key
1 off delivery nozzle
2. Open the front panel using the key provided.
3. Remove the rear panel, if necessary, and store safely.
MOUNTING
4. Bolt the pump to a firm level foundation by means of the four 14
mm diameter-mounting holes provided.
PIPEWORK
5. Connect the 1” dia pipe from the tank to the 1” BSP suction inlet
of the pump. Seal the joints with a suitable thread-sealing
compound. The pipe work must be sealed to the drip tray (if
fitted) to ensure no leaking AdBlue® can flow underground.
An alternative pipe work entry point, for above ground pipe work,
is provided at the rear of the pump base. Push out the plastic
cover plate if required.
6. Connect one end of the delivery hose into the outlet elbow.
Ensure the nylon hose-sealing washer is in place on the hose
end. It should be hand tight plus a quarter turn.
7. Screw the nozzle onto the other end of the hose, again ensuring
the nylon washer is in place. No other sealing compound is
necessary. Hand tight plus a quarter turn.