
20
2.2
Basic excavation
1.
Before excavation, the arm cylinder should have angle with the arm as 90°, bucket with ground to be
excavated as 30°. Only in such case, can each cylinder have the max. excavating force. It is suitable for
relatively hard soil, so as to decrease the excavating resistance.
2.
To excavate any soft soil, bucket should be angled with the soil to be 60°, increasing the work efficiency.
2.3
Lower excavation
Keep the angle between bucket base and the bevel at 30°, and retract the arm to start work.
2.4
Upper excavation
Keep the bucket blade vertical to the ground, and retract the arm to start work.
2.5
Ditching is carried out in 7 steps, as shown in figure.
Summary of Contents for F1000
Page 1: ...1 HYTEC F1000 EXCAVATOR OPERATION PARTS MANUAL ...
Page 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake ...
Page 5: ...5 Section II Main performance parameters ...
Page 11: ...11 Hydraulic system structure of HYTEC F1000 Excavator I Rotary motor ...
Page 12: ...12 ...
Page 15: ...15 ...
Page 16: ...16 Section IV Schematics of main valve ...