HPT USER MANUAL 20
8.
DISCONNECTING FROM VOLTAGE RESOURCES
Before proceeding any operations on inverter, please disconnect the inverter from all
voltage resources as described in this manual.
Following these steps in described sequence are mandatory.
1.
Disconnect miniature circuit-breaker and prevent from unintentional reconnections.
2.
Open the DC switch and prevent the switch from closing unintentionally.
3.
Use clamps to ensure there is no electrical current in DC wires.
4.
Disconnect all DC connections and resources. Unplug the DC connectors, and DO
NOT pull the cables.
5.
Use multimeter to ensure the voltage on DC terminals of inverter is 0.
6.
Unscrew and remove the AC connector.
Danger to life due to high voltages.
Inverter capacitors need 10 minutes to be completely de-energized. Please
wait for 10 minutes to remove the cover.
When an error occurs, DO NOT remove the cover of the inverter onsite. Improper
operations and attempts may induce electric shock.
Summary of Contents for HPT Series
Page 1: ......
Page 2: ...HPT Series 3 Phase Grid tied Solar Inverters USER MANUAL...
Page 21: ...21 HPT USER MANUAL 9 TECHNICAL PARAMETERS...
Page 22: ...HPT USER MANUAL 22...
Page 23: ...23 HPT USER MANUAL...
Page 24: ...HPT USER MANUAL 24...