background image

User  Manual  20 

6.

 

COMMUNICATION 

6.1 System monitoring via Datalogger - RS485/Wi-Fi /GPRS 

(Optional) 

Wi-Fi /GPRS Datalogger Installation 

 

1.

 

Unpack the Datalogger from package. 

2.

 

Unscrew the cap in COM1 port and plug the Datalogger in and tighten. 

3.

 

For user guidance and configuration of Datalogger, please refer to the 

corresponding HYPONTECH Wi-Fi Stick Guide manual, which is available in 

printed form inside Documents pack, or an online manual on HYPONTECH 

website a

https://www.hypontech.com/xiazai

 

 

Summary of Contents for HPT-30K Series

Page 1: ...ADQUATER 中国 江苏省 苏州市高新区湘江路 1508 号 info hypontech com service hypontech com 电话 86 512 8071 2199 售后服务邮箱 service hypontech com 微信公众号 监控平台 公司官网 海鹏科技 澳洲服务 HYPONTECH AUS SERVICE Unit 604 7 Jenkins Rd CARLINGFORD NSW 2118 Service au hypontech com Service Line 61 028 054 0377 ...

Page 2: ...HPT 30K 33K 36K 40K 50K Series 3 Phase Grid tied Solar Inverters USER MANUAL ...

Page 3: ...roduct Overview 8 4 4 INSTALLING 9 4 1 Installation Requirement 9 4 2 Mounting Location 10 4 3 Mounting 11 4 4 Installing the secondary PE cable 12 5 5 COMMISSIONING 14 5 1 Safety Instructions 14 5 2 AC Wire Assembly and Connection 15 5 2 1 AC Commissioning 15 5 3 DC Wire Assembly and Connection 19 DC Commissioning 19 ...

Page 4: ... connection and baud rate settings 21 7 7 START UP AND OPERATION 22 7 1 Safety Check Before Start Up 22 7 2 Inverter LED Indicators 23 7 3 Display and Control Logics 24 When inverter starts up and operates there is a control button beside LCD Display of the inverter Please follow the logics listed below 24 8 DISCONNECTING FROM VOLTAGE RESOURCES 26 9 TECHNICAL PARAMETER 27 10 10 TROUBLE SHOOTING 30...

Page 5: ... BREAKABLE ITEM PLACE UPWARDS USER MANUAL IN PACK 2 SAFETY AND WARNINGS 1 All persons who are responsible for mounting installation commissioning maintenance tests and service of HYPONTECH inverter products must be suitably trained and qualified for corresponding operations They MUST be experienced and have knowledge of operation safety and professional methods All installation personnel must have...

Page 6: ... Under exposure to sunlight the PV array may generate dangerous output in DC voltage Contacts with the DC wires conductors and live components in the inverter may result in lethal shocks 5 High voltages in inverter could cause lethal electrical shocks Before proceeding any work including maintenance and or service on the inverter fully disconnect it from all DC input AC grid and other voltage sour...

Page 7: ...l 3 3 UNPACKING 3 1 Scope of Delivery Please inspect and check for completeness in the scope of delivery Confirm with purchase order 1 DC Connector HPT 30K 33K 36K 6 pairs HPT 40K 50K 8 pairs 2 Wi Fi GPRS optional ...

Page 8: ...User Manual 8 3 2 Product Overview 1 LED LCD or LED 2 DC Switch 3 PV Terminal s 4 COM1 Wi Fi GPRS RS485 port 5 COM2 Smart Meter port 6 COM3 RS485 7 AC Terminal 8 Secondary PE Terminal ...

Page 9: ... at ambient temperature lower than 45 5 When installing in residential or domestic environment it is recommended to install and mount the inverter on a solid concrete wall surface Mounting the inverter on composite or plaster boards or walls with similar materials would induce noise during its operation and is therefore not recommended 6 DO NOT cover the inverter NOR place any objects on top of th...

Page 10: ...verter on tilting surface over 15 backwards Please mount the inverter on a vertical wall surface 4 DO NOT mount the inverter on any surfaces tilting forward or to either sides 5 DO NOT mount the inverter on a horizontal surface 6 For easy installation and operation please mount the inverter on a height that the display could match eye level 7 The bottom side where all commissioning terminals are e...

Page 11: ... ensure tightness of rope then lift to the destination Wall mounting the inverter 1 Use the mounting bracket as a template and drill holes of 10mm diameter and 70mm depth 2 Fix the mounting bracket with the screws and expansion bolts packed in mounting accessories 3 Hold onto the handles on the inverter and tilt it slightly forward Hang up the inverter and attach it to the mounting bracket Check b...

Page 12: ...at washer spring washer is not included in the package 4 4 Installing the secondary PE cable 1 Insert the grounding conductor into the suitable OT terminal lug and crimp the contact 2 Align the terminal lug with the grounding conductor and the ground washer on the screw The teeth of the ground washer must be facing the housing 3 Tighten it firmly into the housing M6 PE terminal screwdriver type Pa...

Page 13: ... PE cable is aligned with other AC phase cables In case the materials are different please ensure the resistance is equivalent to the figure mentioned in the table S 35mm 2 S 2 Please install the secondary PE before connect any other cables Secondary PE cannot replace the connection of PE terminal in AC wiring Both PE and secondary PE should be properly installed Hypontech will not take account fo...

Page 14: ...ollow the inverter s grid connection specifications 2 An external circuit breaker on the AC side or a fuse at 1 25 AC rated current is strongly recommended 3 Reliability of all earth connections must be tested and valid 4 Before commissioning disconnect the inverter and the circuit breaker or fuse and prevent accidental reconnection ...

Page 15: ... 40K HPT 50K 30 50mm B Conductor cross section U V W N线 HPT 30K HPT 33K HPT36K 16 35mm U V W N线 HPT 40K HPT 50K 铜线推荐35 50mm 铝线推荐用70 mm PE线 见下表要求 C N PE Cable insulation strip length Approx 90 mm D U V W Cable insulation strip length Approx 70 mm E Cable insulation strip length Approx 20 mm Make sure the strip length of PE is approx 20 mm longer than L1 L2 L3 and N AC phase cable cross section PE c...

Page 16: ... connected by accident 2 Strip the cable as required 3 Thread the cable through forcing nut of waterproof joint sealing plug waterproof joint and junction box 4 Insert the grounding conductor into the OT terminal lug in the accessory pack and crimp the contact ensure the insulation protection has been done properly S 35mm 2 S 2 Only suitable when the material of PE cable is aligned with other AC p...

Page 17: ...17 User Manual 5 Insert PE N U V and W cable into correspondent hole And secure with cross screwdriver Torque 4 5 6Nm 6 Screw the junction box onto inverter False connection could damage the inverter ...

Page 18: ...s Please install an individual 2 stage miniature circuit breaker according to the following specifications Model Maximum output current A AC Breaker Rated current A HPT 30K 50 63 HPT 33K 55 63 HPT 36K 60 80 HPT 40K 66 7 80 HPT 50K 80 100 ...

Page 19: ... of PV arrays 5 The polarity of the PV arrays MUST be compatible to the DC connectors of the inverter 6 The DC input voltage AND DC input current of the PV array MUST never exceed the maximum input allowance of the inverter DC Commissioning 5 4 Residual Current Protection This product is equipped with residual current protection device internally in accordance with IEC 60364 7 714 An external resi...

Page 20: ...Datalogger from package 2 Unscrew the cap in COM1 port and plug the Datalogger in and tighten 3 For user guidance and configuration of Datalogger please refer to the corresponding HYPONTECH Wi Fi Stick Guide manual which is available in printed form inside Documents pack or an online manual on HYPONTECH website at https www hypontech com xiazai ...

Page 21: ... 2 Output Efficiency Control via Smart Meter The inverter s active power output and efficiency could be monitored via the application of a smart meter Please refer to SDM630 Modbus V2 User manual for its connection and baud rate settings ...

Page 22: ...nd if the AC connector is properly and securely installed Check if the AC connector is firmly plugged into AC terminal 6 Cables Check if all cables are reliably connected Check if the connections are effective while the insulations are undamaged 7 Groundings Check all groundings using multimeter and if all exposed metal parts of the inverter are properly grounded 8 DC Voltage Check if the largest ...

Page 23: ...23 User Manual 7 2 Inverter LED Indicators When the inverter operates LED symbols on display have the following meanings ...

Page 24: ...User Manual 24 7 3 Display and Control Logics When inverter starts up and operates there is a control button beside LCD Display of the inverter Please follow the logics listed below ...

Page 25: ...输入 2 xxxxx xV xx xA 交流输出 R xxxx xV xx xA 交流频率 xx xxHz 软件版本号 Ver V1 0 0 00 安规类型 CN NB T 32004 语 言 中 文 Modbus 地址 x 等待 短按 短按 短按 短按 短按 短按 短按 机器序列号 TXXXXXXXXXXXXXXX 短按 交流输出 S xxxx xV xx xA 交流输出 T xxxx xV xx xA 短按 故 障 Code xx 等 待 xxxS 基于系统运行状态 短按 直流输入 3 xxxxx xV xx xA 直流输入 4 xxxxx xV xx xA 短按 短按 短按 短按 短按 ...

Page 26: ...m closing unintentionally 3 Use clamps to ensure there is no electrical current in DC wires 4 Disconnect all DC connections and resources Unplug the DC connectors and DO NOT pull the cables 5 Use multimeter to ensure the voltage on DC terminals of inverter is 0 6 Unscrew and remove the AC connector Danger to life due to high voltages Inverter capacitors need 10 minutes to be completely de energize...

Page 27: ...00 430 900 500 900 Min DC Voltage Start Up Voltage V 150 180 Nominal DC Input Voltage V 620 Max Input Current A 30 30 30 30 30 30 30 Max DC Short Circuit Current A 45 45 45 45 45 45 45 No of Independent MPPT Inputs 3 4 No of PV Strings per MPPT 2 OUTPUT AC Rated Power W 30000 33000 36000 40000 50000 Max Apparent AC Power VA 33000 36300 39600 44000 55000 Rated Grid Voltage Vac 380 400 3 3L N PE or ...

Page 28: ...ity Protection Integrated Insulation Resistance Detection Integrated Residual Current Monitoring Integrated Output Over Current Protection Integrated Output Short Circuit Protection Integrated Over Voltage Protection II DC III AC Surge Protection DC Type II AC Type II GENERAL DATA Dimensions W H D mm 580 435 242 Weight Kg 38 40 User Interface LCD LED or LED DC Connection Type MC4 D4 SUNCLIX H4 opt...

Page 29: ...Cooling Method Smart Fan Cooling Operating Ambient Temperature 25 60 Relative Humidity 0 to 100 Max Operating Altitude m 2000 2000 Derating Protection class IEC 60529 IP65 Climatic Category IEC 60721 3 4 4K4H Topology Transformerless Night Consumption W 1 ...

Page 30: ...played on the inverter s screen or on the Hypontech s monitoring App Web the red LED will light up The corresponding corrective measures are as follows Error Code Fault Name Description Corrective Measures 1 Functional fault in Micro Controller Unit MCU MCU abnormal self check in start process Disconnect the inverter from the utility grid and the PV array and reconnect it after LED turns off If th...

Page 31: ...nsulation impedance of PV and PV to ground is detected When the detection insulation impedance is less than 200kohm it is judged as insulation fault 1 If it happens occasionally it may be caused by rainy or humid environment After the fault is eliminated the inverter can resume normal operation without other actions If there is continuous alarm please check the PV array s insulation to ground and ...

Page 32: ...outside the permissible range due to local grid conditions try to modify the values of the monitored operational limits after informing the electric utility company first If it cannot be recovered for a long time please confirm whether the AC circuit breaker is disconnected whether the AC terminal is in good connection whether the power supply line is normal whether the AC cable wiring such as wir...

Page 33: ... the utility grid and the PV array and reconnect it after LED turns off If this fault is still being displayed please contact the service 15 Bus voltage too high Bus voltage is greater than 1030V Check the open circuit voltages of the strings and make sure it is below the maximum DC input voltage of the inverter If the input voltage lies within the permissible range while the fault occurs please c...

Page 34: ...User Manual 34 19 N and PE voltage exceeds permitted range Check if the inverter is securely grounded ...

Page 35: ...eters are normal during operation Half a year Commissioning Check if the cables are loose Check if the cable insulations are damaged especially the parts in contact with metal surfaces Half a year after first commissioning Annually OR Half a year Grounding Check if the cables are securely grounded Half a year after first commissioning Annually OR Half a year NOTICE HEAT SINK MIGHT INDUCE INJURY Wh...