hylite Mightylite Pro MLP240B Installation & Operating Instructions Download Page 4

- 7 -

- 6 -

5. AFTER CONNECTING  POWER SUPPLY

•   After the connections have been secured, the floodlight front (Connection Box front) should be fastened to the  

 

  Connection Box using the 4 Connection Box Screws. 
•   Once screws are secure, the screw covers should be fitted [Fig.10] 
•   To secure the angle of light of the Mightylite Pro set the desired position, tighten the 2 Securing bolts then use the 2 x  

 

  Allen screws and washers to lock the position of the Mightylite Pro on the U bracket [Fig.11].

Fig. 10

Fig. 11

Ref:

Description:
Fascia:
Backplate:
Lens:
Wattage:
Lumens generated:
Voltage:
Power factor:
Efficiency:
Colour temperature:
Max. LED life
Operating temperature:
Fixed using mounting bracket:
Optional pipe bracket:
Dimensions (mm):
Weight (kg):
Warranty:

MLP240B

Mightylite PRO 240W Floodlight

Matt black polycarbonate

Matt black aluminium

Frosted

240W

26,000

80 -280V

>0.9

<75%

ANSI 5700K

50,000 hrs

-40°C to +60°C

Yes
Yes

220(H) x 325(W) x 125(D)

5.0

3 years

6. TECHNICAL SPECIFICATION

Fig. 9: Wiring for Four Lighting Levels (using 2 units)

Note: A separate switch is used to control each of the four LED arrays within one or more Mightylite Pro units. Diagram 

shows 2 units wired together so that both can operate at 25%, 50%, 75% or 100% light level dependent upon switching.

EARTH

EARTH

NEUTRAL 1+2

LIVE 4

LIVE 3

LIVE 2

LIVE 1

NEUTRAL 1+2

EARTH

L4 (LIVE)

L3 (LIVE)

L1 (LIVE)

L2 (LIVE)

NEUTRAL

Reviews: