
Hydroid
– Series User Manual
25
04/19
PREPARING UNIT FOR STORAGE OR SHIPMENT
ALL PRESSURE GAUGES MUST READ ZERO BEFORE BEGINNING THESE
PROCEDURES. TURN THE SYSTEM OFF, DISCONNECT THE POWER, AND
BLEED ALL WATER PRESSURE FROM THE SYSTEM.
PREPARING THE SYSTEM FOR STORAGE
1. We recommend NOT leaving the system idle for more than one week.
2. If the period of non-operation is more than one week, we recommend removing the
Membranes, sealing them in a plastic bag, and storing in a refrigerator.
3. If storing Membranes, performance cannot be guaranteed.
During the shut-down period, the area must be kept frost-free, or the ambient temperature must
not exceed 120°F (48.8°C) ambient.
PREPARING THE UNIT FOR SHIPMENT
1. Turn the system off and disconnect it from the electrical power supply.
2. Make sure all pressure gauges on the front panel read 0 PSI before continuing.
3. Disconnect the inlet, CONCENTRATE (drain), and PRODUCT (purified water) tubing.
4. Disconnect the feed, PRODUCT (purified water), and CONCENTRATE (drain) tubing
from the connectors on the pressure vessels.
5. If there is still water in the flow meters disconnect the tubing on the flow meter inlet.
6. Allow the system to draining for a minimum of eight hours or until the opened ports
quit dripping. After draining is complete, reconnect all the plumbing.
7. Prepare the system for storage by following all the above instructions.
Summary of Contents for Hydroid
Page 1: ...Reverse Osmosis User Manual 888 426 5644 info hydrologicsystems com ...
Page 2: ...Hydroid Series User Manual 2 04 19 This page intentionally left blank ...
Page 24: ...Hydroid Series User Manual 24 04 19 OPERATING LOG ...
Page 29: ...Hydroid Series User Manual 29 04 19 CIRCUIT BOARD LAYOUT ...
Page 34: ...Hydroid Series User Manual 34 04 19 HYDROID FLOW DIAGRAM ...
Page 35: ...Hydroid Series User Manual 35 04 19 ELECTRICAL SCHEMATIC ...